MGNREGA Works Dashboard
Admin login

Showcase — Completed Works

Rollup last refreshed: 2026-07-11 02:05:34.314168
to
to
Reset filters
Scope
Works completed
1,81,876
Sanctioned (pure scheme)
₹2,225.66 Cr
Expenditure since inception
₹1,557.93 Cr

Top new work types

Top 10 · ranked by sanction cost (Admin Config)
01
Construction of Check Dam/Stop Dam
11,756 works
₹367.96 Cr sanctioned
₹273.58 Cr spent (74%)
02
Construction of Well
19,793 works
₹302.42 Cr sanctioned
₹241.85 Cr spent (80%)
03
Construction of Road and Culvert
4,153 works
₹276.52 Cr sanctioned
₹173.66 Cr spent (63%)
04
Plantation
9,150 works
₹255.33 Cr sanctioned
₹94.17 Cr spent (37%)
05
Construction of Trench
6,677 works
₹137.63 Cr sanctioned
₹104.40 Cr spent (76%)
06
Rural Housing
61,416 works
₹107.90 Cr sanctioned
₹103.71 Cr spent (96%)
07
Land Development
11,162 works
₹92.70 Cr sanctioned
₹47.12 Cr spent (51%)
08
Constr of Cement Concrete Roads
5,376 works
₹84.83 Cr sanctioned
₹63.05 Cr spent (74%)
09
Construction of Tank
1,548 works
₹83.30 Cr sanctioned
₹66.04 Cr spent (79%)
10
Construction of Bund
4,109 works
₹72.30 Cr sanctioned
₹52.05 Cr spent (72%)

Detailed breakdown (All amounts in ₹ Crore)

By District / Block / Panchayat By New Work Type
Sr. New Work Type Completed Sanctioned Expenditure Exp. %
1 Rural Housing 61,416 107.90 103.71
96%
2 Construction of Well 19,793 302.42 241.85
80%
3 Construction of Toilets 18,624 17.31 15.08
87%
4 Construction of Check Dam/Stop Dam 11,756 367.96 273.58
74%
5 Land Development 11,162 92.70 47.12
51%
6 Plantation 9,150 255.33 94.17
37%
7 Construction of Trench 6,677 137.63 104.40
76%
8 Construction of NADEP/Vermi Compost Pit 5,486 7.60 6.01
79%
9 Constr of Cement Concrete Roads 5,376 84.83 63.05
74%
10 Construction of Road and Culvert 4,153 276.52 173.66
63%
11 Construction of Bund 4,109 72.30 52.05
72%
12 Cattle Shed 3,982 34.24 28.71
84%
13 Farm Pond 2,981 38.88 24.65
63%
14 Well Recharge 2,687 31.72 23.25
73%
15 Construction of Recharge Pits 2,064 9.94 7.31
74%
16 Construction of Tank 1,548 83.30 66.04
79%
17 Boulder Check/Gully Plug 1,209 11.19 8.52
76%
18 Construction of Percolation Tank 938 41.81 32.93
79%
19 Renovation of traditional water bodies 914 13.47 8.84
66%
20 Terracing 726 19.93 15.31
77%
21 Repair & Maint of Check Dam/Stop Dam 714 32.57 28.10
86%
22 Solid and Liquid Waste Management 622 3.00 2.43
81%
23 Construction of Water Drain/Diversion Channel/Drainage/Field Channel 572 17.73 13.65
77%
24 Repair & maint of Pond/ Tank 529 21.78 17.22
79%
25 Constr of Aganwadi 412 9.87 8.70
88%
26 Repair & maint of Water Harvesting Structures 401 12.72 10.60
83%
27 Underground Dyke for Ground Water Recharge 334 3.64 2.45
67%
28 Construction of Crematorium 328 7.90 6.73
85%
29 Goat Shelter 271 1.41 1.12
80%
30 Roof Water Harvesting on gov/panchayat bldg 268 6.42 4.90
76%
31 Constr of Gabion 267 5.75 4.50
78%
32 Repair & maint of Road 243 10.06 8.79
87%
33 Construction of Embankment 225 12.70 10.80
85%
34 Construction of Play field 199 5.04 3.14
62%
35 Community Sanitary Complex 194 1.21 0.82
68%
36 Construction of Spur 182 6.03 4.01
67%
37 Repair & Maint of Bund 178 3.78 3.04
81%
38 Repair & maint of Percolation Tank 143 4.87 3.93
81%
39 Constr of GP Bhawan 110 8.48 7.59
90%
40 Repaire and Maint of NADEP/Vermi Compost Pit 105 0.47 0.41
86%
41 Culvert 103 8.26 6.32
77%
42 Works for Flood Control and Protection 102 4.94 4.17
84%
43 Other Works 91 1.18 0.93
78%
44 Constr of Compound wall 91 3.73 3.41
91%
45 Nursery Development 85 5.00 1.68
34%
46 Constr of Food Grain storage 60 4.82 3.70
77%
47 Constr of Kitchen Shed 56 0.15 0.11
73%
48 Repair & Maint of Canal 41 0.82 0.56
68%
49 Grass Land Development 30 1.70 0.56
33%
50 Deepening / Desilting of Flood Channels 23 3.81 0.60
16%
51 Repair & Maint of Community infrastructure 21 5.83 0.72
12%
52 Construction of building/workshed for SHG 20 0.62 0.51
83%
53 Bio-Fertilizer 19 0.35 0.29
85%
54 Poultry Shelter 18 0.11 0.09
78%
55 Renovation of Canal 17 0.29 0.18
63%
56 Construction of Other Community Building/Assets 13 0.31 0.28
92%
57 Construction of Canal 12 0.64 0.20
31%
58 Strengthening of Embankment 8 0.22 0.11
48%
59 Piggery Shelter 6 0.06 0.05
81%
60 Lining of Canal 5 0.25 0.16
63%
61 Construction of Fish Drying Infrastructure 4 0.16 0.11
70%
62 Bio-gas plant 2 0.01 0.01
91%
63 Lift Irrigation 1 0.03 0.00
19%
Total 1,81,876 2,225.66 1,557.93
All 63 rows (zero-value rows hidden) ⇩ Export to Excel