Showcase — Completed Works

Rollup last refreshed: 2026-09-03 07:03:16.173614
to
to
Reset filters
Scope
Works completed
402
Sanctioned (pure scheme)
₹2.38 Cr
Expenditure since inception
₹1.56 Cr

Top new work types

Top 10 · ranked by sanction cost (Admin Config)
01
Plantation
32 works
₹51.34 L sanctioned
₹12.51 L spent (24%)
02
Construction of Road and Culvert
3 works
₹44.79 L sanctioned
₹24.12 L spent (54%)
03
Rural Housing
220 works
₹39.39 L sanctioned
₹36.77 L spent (93%)
04
Construction of Bund
39 works
₹24.02 L sanctioned
₹16.45 L spent (68%)
05
Constr of Cement Concrete Roads
28 works
₹18.57 L sanctioned
₹18.18 L spent (98%)
06
Terracing
40 works
₹13.95 L sanctioned
₹12.81 L spent (92%)
07
Construction of Check Dam/Stop Dam
2 works
₹10.00 L sanctioned
₹9.72 L spent (97%)
08
Construction of Percolation Tank
1 works
₹5.10 L sanctioned
₹3.50 L spent (69%)
09
Farm Pond
3 works
₹3.96 L sanctioned
₹1.96 L spent (49%)
10
Construction of Play field
1 works
₹3.53 L sanctioned
₹2,004 spent (1%)

Detailed breakdown (All amounts in ₹ Lakh)

By District / Block / Panchayat By New Work Type
Sr. New Work Type Completed Sanctioned Expenditure Exp. %
1 Rural Housing 220 39.39 36.77
93%
2 Terracing 40 13.95 12.81
92%
3 Construction of Bund 39 24.02 16.45
69%
4 Plantation 32 51.34 12.51
24%
5 Constr of Cement Concrete Roads 28 18.57 18.18
98%
6 Construction of NADEP/Vermi Compost Pit 4 1.42 1.03
72%
7 Construction of Well 4 2.88 3.07
107%
8 Land Development 4 2.15 2.03
94%
9 Works for Flood Control and Protection 4 2.15 2.03
95%
10 Culvert 3 1.91 1.89
99%
11 Construction of Road and Culvert 3 44.79 24.12
54%
12 Farm Pond 3 3.96 1.96
49%
13 Construction of Check Dam/Stop Dam 2 10.00 9.72
97%
14 Cattle Shed 2 2.04 1.84
90%
15 Construction of Trench 2 1.48 0.85
58%
16 Construction of Water Drain/Diversion Channel/Drainage/Field Channel 1 0.40 0.45
114%
17 Community Sanitary Complex 1 0.45 0.43
96%
18 Constr of Aganwadi 1 1.80 1.80
100%
19 Constr of Kitchen Shed 1 0.26 0.16
61%
20 Construction of Embankment 1 1.06 1.07
101%
21 Construction of Percolation Tank 1 5.10 3.50
69%
22 Construction of Play field 1 3.53 0.02
1%
23 Boulder Check/Gully Plug 1 0.36 0.35
97%
24 Goat Shelter 1 0.64 0.51
81%
25 Renovation of traditional water bodies 1 2.50 0.86
34%
26 Repair & maint of Pond/ Tank 1 1.51 1.45
96%
27 Solid and Liquid Waste Management 1 0.21 0.13
64%
Total 402 237.88 156.00
All 27 rows (zero-value rows hidden) ⇩ Export to Excel