Showcase — Completed Works

Rollup last refreshed: 2026-09-04 07:04:21.536086
to
to
Reset filters
Scope
Works completed
853
Sanctioned (pure scheme)
₹3.42 Cr
Expenditure since inception
₹2.86 Cr

Top new work types

Top 10 · ranked by sanction cost (Admin Config)
01
Rural Housing
396 works
₹76.27 L sanctioned
₹75.41 L spent (99%)
02
Lining of Canal
2 works
₹63.11 L sanctioned
₹56.90 L spent (90%)
03
Farm Pond
265 works
₹45.97 L sanctioned
₹38.94 L spent (85%)
04
Construction of Bund
55 works
₹30.58 L sanctioned
₹22.85 L spent (75%)
05
Plantation
10 works
₹27.50 L sanctioned
₹16.94 L spent (62%)
06
Construction of Check Dam/Stop Dam
9 works
₹21.82 L sanctioned
₹14.35 L spent (66%)
07
Constr of Cement Concrete Roads
25 works
₹16.99 L sanctioned
₹15.55 L spent (91%)
08
Land Development
26 works
₹11.29 L sanctioned
₹7.52 L spent (67%)
09
Deepening / Desilting of Flood Channels
3 works
₹10.00 L sanctioned
₹7.26 L spent (73%)
10
Construction of Road and Culvert
3 works
₹7.63 L sanctioned
₹3.95 L spent (52%)

Detailed breakdown (All amounts in ₹ Lakh)

By District / Block / Panchayat By New Work Type
Sr. New Work Type Completed Sanctioned Expenditure Exp. %
1 Rural Housing 396 76.27 75.41
99%
2 Farm Pond 265 45.97 38.94
85%
3 Construction of Bund 55 30.58 22.85
75%
4 Solid and Liquid Waste Management 28 1.23 0.68
55%
5 Land Development 26 11.29 7.52
67%
6 Constr of Cement Concrete Roads 25 16.99 15.55
92%
7 Plantation 10 27.50 16.94
62%
8 Construction of Toilets 10 0.44 0.29
65%
9 Construction of Check Dam/Stop Dam 9 21.82 14.35
66%
10 Cattle Shed 6 5.73 5.70
100%
11 Construction of NADEP/Vermi Compost Pit 5 0.22 0.13
57%
12 Construction of Road and Culvert 3 7.63 3.95
52%
13 Terracing 3 2.92 2.53
86%
14 Deepening / Desilting of Flood Channels 3 10.00 7.26
73%
15 Construction of Water Drain/Diversion Channel/Drainage/Field Channel 2 0.78 0.63
81%
16 Lining of Canal 2 63.11 56.90
90%
17 Works for Flood Control and Protection 1 2.99 2.00
67%
18 Community Sanitary Complex 1 0.44 0.40
91%
19 Construction of Canal 1 4.82 4.32
90%
20 Repair & maint of Water Harvesting Structures 1 4.54 3.39
75%
21 Underground Dyke for Ground Water Recharge 1 6.51 5.96
92%
Total 853 341.78 285.69