Works completed
483
Sanctioned (pure scheme)
₹2.92 Cr
Expenditure since inception
₹2.33 Cr

Top new work types

Top 10 · ranked by sanction cost (Admin Config)
01
Works for Flood Control and Protection
11 works
₹41.52 L sanctioned
₹33.58 L spent (81%)
02
Farm Pond
226 works
₹34.86 L sanctioned
₹27.97 L spent (80%)
03
Construction of Trench
6 works
₹29.17 L sanctioned
₹25.63 L spent (88%)
04
Rural Housing
108 works
₹21.08 L sanctioned
₹20.17 L spent (96%)
05
Plantation
8 works
₹20.59 L sanctioned
₹10.33 L spent (50%)
06
Land Development
30 works
₹20.26 L sanctioned
₹14.26 L spent (70%)
07
Cattle Shed
24 works
₹19.60 L sanctioned
₹17.88 L spent (91%)
08
Construction of Road and Culvert
5 works
₹19.36 L sanctioned
₹1.56 L spent (8%)
09
Construction of Check Dam/Stop Dam
11 works
₹18.73 L sanctioned
₹17.29 L spent (92%)
10
Deepening / Desilting of Flood Channels
3 works
₹12.67 L sanctioned
₹11.15 L spent (88%)

Detailed breakdown (All amounts in ₹ Lakh)

By District / Block / Panchayat By New Work Type
Sr. New Work Type Completed Sanctioned Expenditure Exp. %
1 Farm Pond 226 34.86 27.97
80%
2 Rural Housing 108 21.08 20.17
96%
3 Land Development 30 20.26 14.26
70%
4 Cattle Shed 24 19.60 17.88
91%
5 Construction of Bund 16 10.58 8.80
83%
6 Works for Flood Control and Protection 11 41.52 33.58
81%
7 Construction of Check Dam/Stop Dam 11 18.73 17.29
92%
8 Constr of Cement Concrete Roads 11 7.81 12.90
165%
9 Construction of NADEP/Vermi Compost Pit 9 7.26 6.96
96%
10 Plantation 8 20.59 10.33
50%
11 Construction of Trench 6 29.17 25.63
88%
12 Construction of Road and Culvert 5 19.36 1.56
8%
13 Repair & maint of Pond/ Tank 3 10.47 8.83
84%
14 Deepening / Desilting of Flood Channels 3 12.67 11.15
88%
15 Construction of Percolation Tank 2 3.99 3.10
78%
16 Poultry Shelter 2 1.16 1.06
91%
17 Constr of Gabion 1 3.16 2.79
88%
18 Terracing 1 1.99 1.74
87%
19 Lining of Canal 1 3.89 3.42
88%
20 Solid and Liquid Waste Management 1 0.16 0.14
89%
21 Renovation of traditional water bodies 1 2.96 2.64
89%
22 Community Sanitary Complex 1 0.44 0.43
97%
23 Construction of Water Drain/Diversion Channel/Drainage/Field Channel 1 0.19 0.15
79%
24 Constr of Kitchen Shed 1 0.19 0.15
80%
Total 483 292.09 232.93