| Sr. | New Work Type | Completed | Sanctioned | Expenditure | Exp. % |
|---|---|---|---|---|---|
| 1 | Rural Housing | 266 | 0.47 | 0.45 | 95% |
| 2 | Construction of Check Dam/Stop Dam | 196 | 17.67 | 0.81 | 5% |
| 3 | Construction of Bund | 98 | 0.86 | 0.66 | 77% |
| 4 | Farm Pond | 82 | 1.53 | 1.13 | 74% |
| 5 | Land Development | 78 | 0.76 | 0.61 | 80% |
| 6 | Constr of Cement Concrete Roads | 10 | 0.10 | 0.05 | 50% |
| 7 | Construction of NADEP/Vermi Compost Pit | 10 | 0.15 | 0.14 | 91% |
| 8 | Works for Flood Control and Protection | 9 | 0.12 | 0.09 | 78% |
| 9 | Plantation | 8 | 0.13 | 0.04 | 30% |
| 10 | Construction of Trench | 8 | 0.39 | 0.32 | 82% |
| 11 | Construction of Well | 7 | 0.25 | 0.18 | 73% |
| 12 | Well Recharge | 6 | 0.06 | 0.05 | 77% |
| 13 | Repair & maint of Pond/ Tank | 5 | 0.32 | 0.24 | 76% |
| 14 | Construction of Road and Culvert | 4 | 0.23 | 0.24 | 105% |
| 15 | Construction of Crematorium | 2 | 0.04 | 0.03 | 89% |
| 16 | Deepening / Desilting of Flood Channels | 2 | 4.52 | 0.17 | 4% |
| 17 | Construction of Water Drain/Diversion Channel/Drainage/Field Channel | 1 | 0.09 | 0.05 | 57% |
| 18 | Construction of Play field | 1 | 0.01 | 0.01 | 50% |
| 19 | Strengthening of Embankment | 1 | 0.02 | 0.01 | 77% |
| Total | 794 | 27.70 | 5.25 |