Showcase — Completed Works

Rollup last refreshed: 2026-09-16 08:34:45.218851
to
to
Reset filters
Scope
Works completed
794
Sanctioned (pure scheme)
₹27.70 Cr
Expenditure since inception
₹5.25 Cr

Top new work types

Top 10 · ranked by sanction cost (Admin Config)
01
Construction of Check Dam/Stop Dam
196 works
₹17.67 Cr sanctioned
₹80.59 L spent (5%)
02
Deepening / Desilting of Flood Channels
2 works
₹4.52 Cr sanctioned
₹16.65 L spent (4%)
03
Farm Pond
82 works
₹1.53 Cr sanctioned
₹1.13 Cr spent (74%)
04
Construction of Bund
98 works
₹85.57 L sanctioned
₹65.86 L spent (77%)
05
Land Development
78 works
₹76.28 L sanctioned
₹60.64 L spent (80%)
06
Rural Housing
266 works
₹47.15 L sanctioned
₹44.55 L spent (94%)
07
Construction of Trench
8 works
₹38.62 L sanctioned
₹31.54 L spent (82%)
08
Repair & maint of Pond/ Tank
5 works
₹31.90 L sanctioned
₹24.08 L spent (75%)
09
Construction of Well
7 works
₹24.62 L sanctioned
₹17.99 L spent (73%)
10
Construction of Road and Culvert
4 works
₹22.76 L sanctioned
₹23.78 L spent (104%)

Detailed breakdown (All amounts in ₹ Crore)

By District / Block / Panchayat By New Work Type
Sr. New Work Type Completed Sanctioned Expenditure Exp. %
1 Rural Housing 266 0.47 0.45
95%
2 Construction of Check Dam/Stop Dam 196 17.67 0.81
5%
3 Construction of Bund 98 0.86 0.66
77%
4 Farm Pond 82 1.53 1.13
74%
5 Land Development 78 0.76 0.61
80%
6 Constr of Cement Concrete Roads 10 0.10 0.05
50%
7 Construction of NADEP/Vermi Compost Pit 10 0.15 0.14
91%
8 Works for Flood Control and Protection 9 0.12 0.09
78%
9 Plantation 8 0.13 0.04
30%
10 Construction of Trench 8 0.39 0.32
82%
11 Construction of Well 7 0.25 0.18
73%
12 Well Recharge 6 0.06 0.05
77%
13 Repair & maint of Pond/ Tank 5 0.32 0.24
76%
14 Construction of Road and Culvert 4 0.23 0.24
105%
15 Construction of Crematorium 2 0.04 0.03
89%
16 Deepening / Desilting of Flood Channels 2 4.52 0.17
4%
17 Construction of Water Drain/Diversion Channel/Drainage/Field Channel 1 0.09 0.05
57%
18 Construction of Play field 1 0.01 0.01
50%
19 Strengthening of Embankment 1 0.02 0.01
77%
Total 794 27.70 5.25
All 19 rows (zero-value rows hidden) ⇩ Export to Excel