MGNREGA Works Dashboard
MGNREGA VBGRAMG MGNREGA + VBGRAMG
Admin login

Showcase — Completed Works

Rollup last refreshed: 2026-09-20 07:03:41.950739
to
to
Reset filters
Scope
Works completed
860
Sanctioned (pure scheme)
₹9.06 Cr
Expenditure since inception
₹7.41 Cr

Top new work types

Top 10 · ranked by sanction cost (Admin Config)
01
Farm Pond
142 works
₹1.84 Cr sanctioned
₹1.51 Cr spent (82%)
02
Construction of Bund
155 works
₹1.57 Cr sanctioned
₹1.34 Cr spent (85%)
03
Construction of Check Dam/Stop Dam
134 works
₹1.52 Cr sanctioned
₹1.20 Cr spent (79%)
04
Construction of Well
20 works
₹64.90 L sanctioned
₹55.44 L spent (85%)
05
Construction of Road and Culvert
5 works
₹58.40 L sanctioned
₹50.20 L spent (86%)
06
Rural Housing
299 works
₹56.32 L sanctioned
₹53.74 L spent (95%)
07
Construction of Tank
7 works
₹43.94 L sanctioned
₹34.91 L spent (79%)
08
Plantation
17 works
₹32.83 L sanctioned
₹14.01 L spent (43%)
09
Construction of Percolation Tank
2 works
₹23.41 L sanctioned
₹22.39 L spent (96%)
10
Well Recharge
4 works
₹19.42 L sanctioned
₹14.73 L spent (76%)

Detailed breakdown (All amounts in ₹ Crore)

By District / Block / Panchayat By New Work Type
Sr. New Work Type Completed Sanctioned Expenditure Exp. %
1 Rural Housing 299 0.56 0.54
95%
2 Construction of Bund 155 1.57 1.34
86%
3 Farm Pond 142 1.84 1.51
82%
4 Construction of Check Dam/Stop Dam 134 1.52 1.20
79%
5 Construction of Well 20 0.65 0.55
85%
6 Land Development 19 0.15 0.18
118%
7 Plantation 17 0.33 0.14
43%
8 Construction of NADEP/Vermi Compost Pit 11 0.03 0.03
93%
9 Constr of Cement Concrete Roads 10 0.06 0.06
95%
10 Construction of Toilets 10 0.01 0.00
7%
11 Construction of Tank 7 0.44 0.35
79%
12 Construction of Road and Culvert 5 0.58 0.50
86%
13 Repair & maint of Pond/ Tank 5 0.19 0.16
87%
14 Construction of Recharge Pits 5 0.01 0.00
61%
15 Well Recharge 4 0.19 0.15
76%
16 Works for Flood Control and Protection 4 0.13 0.10
75%
17 Roof Water Harvesting on gov/panchayat bldg 3 0.12 0.10
86%
18 Construction of Trench 2 0.15 0.10
66%
19 Other Works 2 0.06 0.06
91%
20 Construction of Percolation Tank 2 0.23 0.22
96%
21 Deepening / Desilting of Flood Channels 1 0.13 0.05
39%
22 Construction of Water Drain/Diversion Channel/Drainage/Field Channel 1 0.00 0.00
52%
23 Cattle Shed 1 0.01 0.01
85%
24 Repair & Maint of Community infrastructure 1 0.09 0.05
52%
Total 860 9.06 7.41
All 24 rows (zero-value rows hidden) ⇩ Export to Excel