MGNREGA Works Dashboard
Admin login

Showcase — Completed Works

Rollup last refreshed: 2026-07-11 02:05:34.314168
to
to
Reset filters
Scope
Works completed
2,62,485
Sanctioned (pure scheme)
₹3,329.27 Cr
Expenditure since inception
₹2,197.43 Cr

Top new work types

Top 10 · ranked by sanction cost (Admin Config)
01
Land Development
35,874 works
₹425.48 Cr sanctioned
₹150.42 Cr spent (35%)
02
Construction of Road and Culvert
6,660 works
₹412.92 Cr sanctioned
₹297.98 Cr spent (72%)
03
Construction of Check Dam/Stop Dam
9,711 works
₹349.33 Cr sanctioned
₹219.41 Cr spent (63%)
04
Farm Pond
14,894 works
₹304.71 Cr sanctioned
₹204.38 Cr spent (67%)
05
Plantation
8,173 works
₹259.95 Cr sanctioned
₹109.98 Cr spent (42%)
06
Rural Housing
1,29,094 works
₹237.40 Cr sanctioned
₹224.07 Cr spent (94%)
07
Construction of Bund
8,897 works
₹200.31 Cr sanctioned
₹129.08 Cr spent (64%)
08
Construction of Well
8,253 works
₹138.24 Cr sanctioned
₹104.98 Cr spent (76%)
09
Constr of Cement Concrete Roads
5,992 works
₹115.02 Cr sanctioned
₹86.14 Cr spent (75%)
10
Construction of Percolation Tank
2,367 works
₹111.20 Cr sanctioned
₹89.23 Cr spent (80%)

Detailed breakdown (All amounts in ₹ Crore)

By District / Block / Panchayat By New Work Type
Sr. New Work Type Completed Sanctioned Expenditure Exp. %
1 Rural Housing 1,29,094 237.40 224.07
94%
2 Land Development 35,874 425.48 150.42
35%
3 Farm Pond 14,894 304.71 204.38
67%
4 Construction of Check Dam/Stop Dam 9,711 349.33 219.41
63%
5 Construction of Bund 8,897 200.31 129.08
64%
6 Construction of Well 8,253 138.24 104.98
76%
7 Plantation 8,173 259.95 109.98
42%
8 Construction of Toilets 7,707 8.38 6.97
83%
9 Construction of Road and Culvert 6,660 412.92 297.98
72%
10 Constr of Cement Concrete Roads 5,992 115.02 86.14
75%
11 Construction of Trench 2,779 107.11 84.90
79%
12 Construction of Percolation Tank 2,367 111.20 89.23
80%
13 Renovation of traditional water bodies 2,052 66.11 41.31
63%
14 Well Recharge 2,035 41.89 15.81
38%
15 Construction of NADEP/Vermi Compost Pit 1,890 8.71 6.48
74%
16 Repair & maint of Pond/ Tank 1,680 75.07 60.71
81%
17 Solid and Liquid Waste Management 1,429 8.70 6.22
72%
18 Cattle Shed 1,291 19.73 17.11
87%
19 Construction of Recharge Pits 1,216 9.43 6.89
73%
20 Construction of Crematorium 927 28.28 21.05
75%
21 Culvert 918 53.04 47.65
90%
22 Construction of Tank 764 43.81 36.14
83%
23 Boulder Check/Gully Plug 697 13.25 10.25
77%
24 Construction of Play field 646 30.65 24.12
79%
25 Nursery Development 620 19.04 6.31
33%
26 Construction of Water Drain/Diversion Channel/Drainage/Field Channel 581 34.88 24.68
71%
27 Works for Flood Control and Protection 507 23.90 19.60
82%
28 Constr of Aganwadi 380 15.38 13.31
87%
29 Constr of GP Bhawan 375 15.39 13.22
86%
30 Terracing 373 12.40 9.59
77%
31 Community Sanitary Complex 323 1.67 1.36
81%
32 Roof Water Harvesting on gov/panchayat bldg 309 4.76 3.70
78%
33 Constr of Gabion 228 11.67 8.77
75%
34 Repair & Maint of Check Dam/Stop Dam 221 13.73 11.49
84%
35 Repair & maint of Percolation Tank 220 15.62 12.74
82%
36 Repair & maint of Water Harvesting Structures 207 10.28 8.29
81%
37 Other Works 186 5.43 2.56
47%
38 Constr of Food Grain storage 178 4.25 3.77
89%
39 Repair & Maint of Community infrastructure 173 8.28 6.99
85%
40 Constr of Compound wall 163 4.21 3.57
85%
41 Constr of Kitchen Shed 158 0.70 0.49
70%
42 Goat Shelter 138 1.12 0.89
80%
43 Repair & maint of Road 127 9.95 8.83
89%
44 Repair & Maint of Bund 103 5.68 4.78
84%
45 Poultry Shelter 96 1.04 0.86
83%
46 Underground Dyke for Ground Water Recharge 90 3.01 2.33
78%
47 Construction of Canal 84 5.50 3.56
65%
48 Repaire and Maint of NADEP/Vermi Compost Pit 70 0.45 0.28
61%
49 Construction of Spur 67 3.99 3.21
81%
50 Deepening / Desilting of Flood Channels 67 3.05 2.22
73%
51 Renovation of Canal 61 3.60 2.62
73%
52 Repair & Maint of Canal 54 2.42 2.04
84%
53 Bio-Fertilizer 50 0.97 0.81
83%
54 Construction of building/workshed for SHG 49 1.16 0.99
85%
55 Grass Land Development 38 0.81 0.46
57%
56 Construction of Other Community Building/Assets 36 1.80 1.70
95%
57 Construction of Embankment 32 1.85 1.59
86%
58 Construction of Village Haats 27 0.89 0.84
94%
59 Lining of Canal 26 1.80 1.59
89%
60 Construction of Fish Drying Infrastructure 26 0.75 0.57
77%
61 Piggery Shelter 25 0.62 0.53
86%
62 Strengthening of Embankment 22 0.95 0.77
81%
63 Repair & maint of Gully Plugs 18 1.04 0.76
73%
64 Water Converation - Others 13 0.25 0.10
40%
65 Lift Irrigation 8 5.91 3.15
53%
66 Fish Culture 5 0.21 0.16
74%
67 Bio-gas plant 5 0.11 0.07
60%
Total 2,62,485 3,329.27 2,197.43
All 67 rows (zero-value rows hidden) ⇩ Export to Excel