Top new work types
Top 10 · ranked by sanction cost (Admin Config)
01
Construction of Road and Culvert
15 works
₹1.19 Cr sanctioned
₹91.76 L spent (77%)
02
Construction of Bund
35 works
₹86.64 L sanctioned
₹59.17 L spent (68%)
03
Land Development
94 works
₹84.01 L sanctioned
₹76.72 L spent (91%)
04
Construction of Check Dam/Stop Dam
35 works
₹77.27 L sanctioned
₹66.78 L spent (86%)
05
Rural Housing
266 works
₹49.10 L sanctioned
₹48.44 L spent (99%)
06
Construction of Water Drain/Diversion Channel/Drainage/Field Channel
7 works
₹36.88 L sanctioned
₹26.10 L spent (71%)
07
Construction of Percolation Tank
6 works
₹36.30 L sanctioned
₹30.13 L spent (83%)
08
Construction of Trench
3 works
₹32.54 L sanctioned
₹27.61 L spent (85%)
09
Farm Pond
28 works
₹32.38 L sanctioned
₹26.54 L spent (82%)
10
Construction of Well
7 works
₹27.08 L sanctioned
₹15.59 L spent (58%)