MGNREGA Works Dashboard
MGNREGA VBGRAMG MGNREGA + VBGRAMG
Admin login

Showcase — Completed Works

Rollup last refreshed: 2026-09-14 07:02:51.614626
to
to
Reset filters
Scope
Works completed
634
Sanctioned (pure scheme)
₹7.95 Cr
Expenditure since inception
₹6.48 Cr

Top new work types

Top 10 · ranked by sanction cost (Admin Config)
01
Construction of Road and Culvert
15 works
₹1.19 Cr sanctioned
₹91.76 L spent (77%)
02
Construction of Bund
35 works
₹86.64 L sanctioned
₹59.17 L spent (68%)
03
Land Development
94 works
₹84.01 L sanctioned
₹76.72 L spent (91%)
04
Construction of Check Dam/Stop Dam
35 works
₹77.27 L sanctioned
₹66.78 L spent (86%)
05
Rural Housing
266 works
₹49.10 L sanctioned
₹48.44 L spent (99%)
06
Construction of Water Drain/Diversion Channel/Drainage/Field Channel
7 works
₹36.88 L sanctioned
₹26.10 L spent (71%)
07
Construction of Percolation Tank
6 works
₹36.30 L sanctioned
₹30.13 L spent (83%)
08
Construction of Trench
3 works
₹32.54 L sanctioned
₹27.61 L spent (85%)
09
Farm Pond
28 works
₹32.38 L sanctioned
₹26.54 L spent (82%)
10
Construction of Well
7 works
₹27.08 L sanctioned
₹15.59 L spent (58%)

Detailed breakdown (All amounts in ₹ Crore)

By District / Block / Panchayat By New Work Type
Sr. New Work Type Completed Sanctioned Expenditure Exp. %
1 Rural Housing 266 0.49 0.48
99%
2 Land Development 94 0.84 0.77
91%
3 Construction of Bund 35 0.87 0.59
68%
4 Construction of Check Dam/Stop Dam 35 0.77 0.67
86%
5 Construction of Toilets 33 0.08 0.06
73%
6 Farm Pond 28 0.32 0.27
82%
7 Cattle Shed 22 0.22 0.21
93%
8 Solid and Liquid Waste Management 18 0.06 0.03
50%
9 Constr of Cement Concrete Roads 18 0.15 0.12
79%
10 Construction of Road and Culvert 15 1.19 0.92
77%
11 Plantation 8 0.25 0.18
72%
12 Construction of Well 7 0.27 0.16
58%
13 Construction of Water Drain/Diversion Channel/Drainage/Field Channel 7 0.37 0.26
71%
14 Construction of Recharge Pits 7 0.15 0.08
53%
15 Construction of Percolation Tank 6 0.36 0.30
83%
16 Construction of NADEP/Vermi Compost Pit 6 0.06 0.05
80%
17 Well Recharge 4 0.01 0.01
57%
18 Construction of Trench 3 0.33 0.28
85%
19 Construction of Tank 3 0.13 0.10
81%
20 Boulder Check/Gully Plug 2 0.02 0.02
96%
21 Construction of Fish Drying Infrastructure 2 0.05 0.04
83%
22 Repair & maint of Water Harvesting Structures 2 0.10 0.08
83%
23 Deepening / Desilting of Flood Channels 1 0.05 0.05
93%
24 Grass Land Development 1 0.04 0.03
78%
25 Culvert 1 0.15 0.15
97%
26 Lift Irrigation 1 0.15 0.16
106%
27 Renovation of traditional water bodies 1 0.05 0.05
97%
28 Repair & Maint of Check Dam/Stop Dam 1 0.03 0.02
82%
29 Repair & maint of Pond/ Tank 1 0.02 0.01
78%
30 Roof Water Harvesting on gov/panchayat bldg 1 0.00 0.00
114%
31 Constr of Food Grain storage 1 0.13 0.13
99%
32 Underground Dyke for Ground Water Recharge 1 0.02 0.02
98%
33 Constr of Aganwadi 1 0.08 0.08
96%
34 Other Works 1 0.00 0.00
87%
35 Construction of Canal 1 0.15 0.12
84%
Total 634 7.95 6.48
All 35 rows (zero-value rows hidden) ⇩ Export to Excel