Showcase — Completed Works
Rollup last refreshed: 2026-08-19 08:32:20.978731
Top new work types
Top 10 · ranked by sanction cost (Admin Config)
01
Land Development
91 works
₹86.39 L sanctioned
₹81.89 L spent (95%)
02
Construction of Road and Culvert
9 works
₹43.09 L sanctioned
₹37.83 L spent (88%)
03
Rural Housing
235 works
₹42.63 L sanctioned
₹42.76 L spent (100%)
04
Construction of Check Dam/Stop Dam
50 works
₹41.52 L sanctioned
₹31.02 L spent (75%)
05
Construction of Bund
30 works
₹39.69 L sanctioned
₹32.42 L spent (82%)
06
Works for Flood Control and Protection
12 works
₹38.33 L sanctioned
₹34.17 L spent (89%)
07
Repair & maint of Pond/ Tank
4 works
₹28.48 L sanctioned
₹24.96 L spent (88%)
08
Construction of Tank
6 works
₹26.66 L sanctioned
₹20.87 L spent (78%)
09
Farm Pond
20 works
₹26.48 L sanctioned
₹23.20 L spent (88%)
10
Construction of Water Drain/Diversion Channel/Drainage/Field Channel
8 works
₹24.04 L sanctioned
₹19.19 L spent (80%)