MGNREGA Works Dashboard
MGNREGA VBGRAMG MGNREGA + VBGRAMG
Admin login

Showcase — Completed Works

Rollup last refreshed: 2026-09-01 08:48:19.512575
to
to
Reset filters
Scope
Works completed
508
Sanctioned (pure scheme)
₹3.98 Cr
Expenditure since inception
₹3.74 Cr

Top new work types

Top 10 · ranked by sanction cost (Admin Config)
01
Construction of Road and Culvert
23 works
₹93.35 L sanctioned
₹84.35 L spent (90%)
02
Construction of Bund
144 works
₹59.07 L sanctioned
₹53.98 L spent (91%)
03
Works for Flood Control and Protection
6 works
₹54.68 L sanctioned
₹37.57 L spent (69%)
04
Rural Housing
224 works
₹41.28 L sanctioned
₹41.09 L spent (100%)
05
Construction of Tank
4 works
₹26.61 L sanctioned
₹21.95 L spent (82%)
06
Fish Culture
3 works
₹16.34 L sanctioned
₹12.39 L spent (76%)
07
Constr of Cement Concrete Roads
22 works
₹14.67 L sanctioned
₹13.22 L spent (90%)
08
Construction of Check Dam/Stop Dam
13 works
₹13.38 L sanctioned
₹20.34 L spent (152%)
09
Construction of Percolation Tank
2 works
₹11.71 L sanctioned
₹10.03 L spent (86%)
10
Plantation
5 works
₹10.96 L sanctioned
₹9.05 L spent (83%)

Detailed breakdown (All amounts in ₹ Lakh)

By District / Block / Panchayat By New Work Type
Sr. New Work Type Completed Sanctioned Expenditure Exp. %
1 Rural Housing 224 41.28 41.09
100%
2 Construction of Bund 144 59.07 53.98
91%
3 Construction of Road and Culvert 23 93.35 84.35
90%
4 Constr of Cement Concrete Roads 22 14.67 13.22
90%
5 Construction of Trench 14 4.43 21.37
482%
6 Construction of Check Dam/Stop Dam 13 13.38 20.34
152%
7 Land Development 12 6.27 6.66
106%
8 Construction of NADEP/Vermi Compost Pit 9 1.51 1.34
89%
9 Solid and Liquid Waste Management 8 2.02 1.82
90%
10 Works for Flood Control and Protection 6 54.68 37.57
69%
11 Plantation 5 10.96 9.05
83%
12 Farm Pond 4 5.10 4.50
88%
13 Construction of Tank 4 26.61 21.95
83%
14 Fish Culture 3 16.34 12.39
76%
15 Repair & Maint of Fish Drying Infrastructure 3 10.50 10.10
96%
16 Deepening / Desilting of Flood Channels 2 9.77 9.65
99%
17 Construction of Percolation Tank 2 11.71 10.03
86%
18 Construction of Toilets 2 0.56 0.56
100%
19 Roof Water Harvesting on gov/panchayat bldg 2 0.10 0.10
96%
20 Construction of Water Drain/Diversion Channel/Drainage/Field Channel 1 1.18 0.93
79%
21 Constr of Kitchen Shed 1 0.19 0.09
49%
22 Construction of building/workshed for SHG 1 6.40 6.16
96%
23 Construction of Recharge Pits 1 0.12 0.09
75%
24 Grass Land Development 1 1.26 1.23
98%
25 Repair & maint of Pond/ Tank 1 6.12 5.26
86%
Total 508 397.58 373.83
All 25 rows (zero-value rows hidden) ⇩ Export to Excel