Showcase — Completed Works
Rollup last refreshed: 2026-08-18 08:29:42.702774
Top new work types
Top 10 · ranked by sanction cost (Admin Config)
01
Construction of Road and Culvert
12 works
₹1.52 Cr sanctioned
₹1.37 Cr spent (90%)
02
Works for Flood Control and Protection
22 works
₹1.27 Cr sanctioned
₹1.09 Cr spent (85%)
03
Construction of Water Drain/Diversion Channel/Drainage/Field Channel
11 works
₹97.66 L sanctioned
₹93.91 L spent (96%)
04
Construction of Percolation Tank
19 works
₹93.70 L sanctioned
₹76.03 L spent (81%)
05
Rural Housing
242 works
₹42.78 L sanctioned
₹42.24 L spent (99%)
06
Construction of Well
12 works
₹35.12 L sanctioned
₹33.33 L spent (95%)
07
Construction of Check Dam/Stop Dam
5 works
₹34.83 L sanctioned
₹31.87 L spent (92%)
08
Constr of Cement Concrete Roads
31 works
₹32.48 L sanctioned
₹30.01 L spent (92%)
09
Plantation
9 works
₹26.09 L sanctioned
₹14.93 L spent (57%)
10
Constr of Compound wall
3 works
₹14.58 L sanctioned
₹13.49 L spent (93%)