Works completed
681
Sanctioned (pure scheme)
₹4.59 Cr
Expenditure since inception
₹2.97 Cr

Top new work types

Top 10 · ranked by sanction cost (Admin Config)
01
Rural Housing
534 works
₹88.27 L sanctioned
₹87.49 L spent (99%)
02
Construction of Road and Culvert
8 works
₹78.43 L sanctioned
₹15.13 L spent (19%)
03
Construction of Water Drain/Diversion Channel/Drainage/Field Channel
5 works
₹55.74 L sanctioned
₹28.71 L spent (52%)
04
Construction of Check Dam/Stop Dam
26 works
₹37.39 L sanctioned
₹17.78 L spent (48%)
05
Poultry Shelter
21 works
₹29.61 L sanctioned
₹28.76 L spent (97%)
06
Construction of Percolation Tank
2 works
₹27.15 L sanctioned
₹24.36 L spent (90%)
07
Plantation
6 works
₹24.10 L sanctioned
₹5.72 L spent (24%)
08
Constr of Cement Concrete Roads
23 works
₹23.38 L sanctioned
₹19.35 L spent (83%)
09
Construction of Trench
5 works
₹22.69 L sanctioned
₹17.69 L spent (78%)
10
Construction of Bund
25 works
₹22.53 L sanctioned
₹19.92 L spent (88%)

Detailed breakdown (All amounts in ₹ Lakh)

By District / Block / Panchayat By New Work Type
Sr. New Work Type Completed Sanctioned Expenditure Exp. %
1 Rural Housing 534 88.27 87.49
99%
2 Construction of Check Dam/Stop Dam 26 37.39 17.78
48%
3 Construction of Bund 25 22.53 19.92
88%
4 Constr of Cement Concrete Roads 23 23.38 19.35
83%
5 Poultry Shelter 21 29.61 28.76
97%
6 Construction of Road and Culvert 8 78.43 15.13
19%
7 Plantation 6 24.10 5.72
24%
8 Land Development 6 10.02 5.79
58%
9 Construction of Trench 5 22.69 17.69
78%
10 Construction of Water Drain/Diversion Channel/Drainage/Field Channel 5 55.74 28.71
52%
11 Cattle Shed 4 3.80 1.67
44%
12 Repair & maint of Pond/ Tank 3 8.51 8.66
102%
13 Farm Pond 3 3.51 1.57
45%
14 Construction of Percolation Tank 2 27.15 24.36
90%
15 Constr of Aganwadi 2 3.68 3.39
92%
16 Construction of Well 1 0.76 1.24
164%
17 Community Sanitary Complex 1 0.50 0.53
107%
18 Constr of Compound wall 1 0.54 0.71
132%
19 Construction of Crematorium 1 1.84 1.68
91%
20 Construction of NADEP/Vermi Compost Pit 1 5.98 4.16
70%
21 Construction of Play field 1 8.33 0.33
4%
22 Terracing 1 1.97 1.81
92%
23 Construction of Toilets 1 0.44 0.21
48%
Total 681 459.17 296.67