MGNREGA Works Dashboard
Admin login

Showcase — Completed Works

Rollup last refreshed: 2026-07-11 02:05:34.314168
to
to
Reset filters
Scope
Works completed
1,02,225
Sanctioned (pure scheme)
₹1,265.25 Cr
Expenditure since inception
₹918.18 Cr

Top new work types

Top 10 · ranked by sanction cost (Admin Config)
01
Construction of Road and Culvert
3,223 works
₹288.99 Cr sanctioned
₹163.80 Cr spent (57%)
02
Construction of Check Dam/Stop Dam
4,922 works
₹184.83 Cr sanctioned
₹145.25 Cr spent (79%)
03
Construction of Tank
2,647 works
₹120.72 Cr sanctioned
₹97.94 Cr spent (81%)
04
Rural Housing
55,127 works
₹101.65 Cr sanctioned
₹96.89 Cr spent (95%)
05
Farm Pond
4,398 works
₹99.08 Cr sanctioned
₹78.06 Cr spent (79%)
06
Constr of Cement Concrete Roads
4,400 works
₹77.45 Cr sanctioned
₹58.84 Cr spent (76%)
07
Plantation
1,701 works
₹54.25 Cr sanctioned
₹29.54 Cr spent (54%)
08
Construction of Well
1,994 works
₹44.48 Cr sanctioned
₹33.99 Cr spent (76%)
09
Land Development
4,324 works
₹43.36 Cr sanctioned
₹23.91 Cr spent (55%)
10
Construction of Trench
658 works
₹33.87 Cr sanctioned
₹27.50 Cr spent (81%)

Detailed breakdown (All amounts in ₹ Crore)

By District / Block / Panchayat By New Work Type
Sr. New Work Type Completed Sanctioned Expenditure Exp. %
1 Rural Housing 55,127 101.65 96.89
95%
2 Construction of Toilets 8,788 7.69 5.78
75%
3 Construction of Check Dam/Stop Dam 4,922 184.83 145.25
79%
4 Constr of Cement Concrete Roads 4,400 77.45 58.84
76%
5 Farm Pond 4,398 99.08 78.06
79%
6 Land Development 4,324 43.36 23.91
55%
7 Construction of Road and Culvert 3,223 288.99 163.80
57%
8 Construction of NADEP/Vermi Compost Pit 2,968 4.38 2.62
60%
9 Construction of Tank 2,647 120.72 97.94
81%
10 Construction of Well 1,994 44.48 33.99
76%
11 Plantation 1,701 54.25 29.54
55%
12 Solid and Liquid Waste Management 900 2.75 2.28
83%
13 Construction of Bund 720 26.61 21.24
80%
14 Construction of Crematorium 686 16.91 12.12
72%
15 Cattle Shed 673 23.22 20.77
89%
16 Construction of Trench 658 33.87 27.50
81%
17 Construction of Recharge Pits 522 12.16 9.46
78%
18 Construction of Percolation Tank 507 16.96 12.94
76%
19 Well Recharge 401 7.86 5.90
75%
20 Construction of Play field 333 7.88 3.71
47%
21 Repair & maint of Pond/ Tank 318 12.31 10.19
83%
22 Constr of Aganwadi 195 6.55 5.88
90%
23 Constr of GP Bhawan 194 11.04 8.27
75%
24 Community Sanitary Complex 191 1.34 0.78
58%
25 Culvert 163 5.14 4.15
81%
26 Constr of Gabion 157 9.15 6.64
73%
27 Repair & Maint of Community infrastructure 156 7.55 4.02
53%
28 Construction of Water Drain/Diversion Channel/Drainage/Field Channel 144 7.01 1.79
26%
29 Renovation of traditional water bodies 117 3.71 1.93
52%
30 Boulder Check/Gully Plug 84 1.16 1.08
93%
31 Repair & Maint of Check Dam/Stop Dam 59 3.51 3.08
88%
32 Goat Shelter 55 0.86 0.64
74%
33 Roof Water Harvesting on gov/panchayat bldg 48 1.63 1.30
80%
34 Terracing 48 1.60 1.28
80%
35 Constr of Compound wall 44 0.60 0.57
94%
36 Repair & maint of Road 37 4.74 4.11
87%
37 Repair & maint of Percolation Tank 37 1.18 0.93
79%
38 Repaire and Maint of NADEP/Vermi Compost Pit 34 0.18 0.15
82%
39 Constr of Food Grain storage 32 1.44 1.09
76%
40 Construction of Spur 28 1.02 0.81
79%
41 Repair & maint of Water Harvesting Structures 22 1.11 0.96
87%
42 Nursery Development 22 0.47 0.26
57%
43 Underground Dyke for Ground Water Recharge 21 0.50 0.38
77%
44 Construction of Embankment 20 1.54 1.44
94%
45 Other Works 15 0.47 0.16
34%
46 Construction of building/workshed for SHG 14 0.60 0.54
89%
47 Repair & Maint of Bund 13 0.84 0.64
76%
48 Construction of Other Community Building/Assets 12 0.95 0.96
101%
49 Works for Flood Control and Protection 11 0.13 0.13
95%
50 Bio-Fertilizer 10 0.10 0.06
63%
51 Construction of Village Haats 6 0.47 0.46
99%
52 Grass Land Development 5 0.42 0.27
64%
53 Construction of Canal 4 0.24 0.19
79%
54 Constr of Kitchen Shed 3 0.00 0.00
69%
55 Poultry Shelter 3 0.30 0.30
99%
56 Lift Irrigation 3 0.07 0.05
69%
57 Strengthening of Embankment 2 0.02 0.00
19%
58 Piggery Shelter 2 0.03 0.02
63%
59 Lining of Canal 1 0.10 0.09
88%
60 Bio-gas plant 1 0.02 0.01
32%
61 Deepening / Desilting of Flood Channels 1 0.00 0.00
95%
62 Renovation of Canal 1 0.02 0.02
100%
Total 1,02,225 1,265.25 918.18
All 62 rows (zero-value rows hidden) ⇩ Export to Excel