Showcase — Completed Works

Rollup last refreshed: 2026-10-03 07:03:33.556133
to
to
Reset filters
Scope
Works completed
90,68,509
Sanctioned (pure scheme)
₹107,824.05 Cr
Expenditure since inception
₹73,505.44 Cr

Top new work types

Top 10 · ranked by sanction cost (Admin Config)
01
Construction of Road and Culvert
2,19,040 works
₹15,137.35 Cr sanctioned
₹10,389.11 Cr spent (69%)
02
Construction of Check Dam/Stop Dam
4,30,255 works
₹15,075.47 Cr sanctioned
₹10,450.59 Cr spent (69%)
03
Land Development
5,40,956 works
₹8,809.15 Cr sanctioned
₹3,100.99 Cr spent (35%)
04
Plantation
3,66,074 works
₹8,795.09 Cr sanctioned
₹3,459.99 Cr spent (39%)
05
Rural Housing
45,30,891 works
₹8,241.85 Cr sanctioned
₹7,819.78 Cr spent (95%)
06
Construction of Well
3,81,721 works
₹8,207.51 Cr sanctioned
₹6,514.02 Cr spent (79%)
07
Construction of Bund
2,86,919 works
₹6,525.36 Cr sanctioned
₹3,444.47 Cr spent (53%)
08
Farm Pond
3,93,585 works
₹5,792.84 Cr sanctioned
₹3,649.70 Cr spent (63%)
09
Constr of Cement Concrete Roads
3,83,964 works
₹5,384.18 Cr sanctioned
₹3,990.23 Cr spent (74%)
10
Construction of Trench
1,03,016 works
₹3,755.27 Cr sanctioned
₹3,019.14 Cr spent (80%)

Detailed breakdown (All amounts in ₹ Crore)

By District / Block / Panchayat By New Work Type
Sr. New Work Type Completed Sanctioned Expenditure Exp. %
1 Rural Housing 45,30,891 8,241.85 7,819.78
95%
2 Land Development 5,40,956 8,809.15 3,100.99
35%
3 Construction of Toilets 4,78,819 545.48 456.68
84%
4 Construction of Check Dam/Stop Dam 4,30,255 15,075.47 10,450.59
69%
5 Farm Pond 3,93,585 5,792.84 3,649.70
63%
6 Constr of Cement Concrete Roads 3,83,964 5,384.18 3,990.23
74%
7 Construction of Well 3,81,721 8,207.51 6,514.02
79%
8 Plantation 3,66,074 8,795.09 3,459.99
39%
9 Construction of Bund 2,86,919 6,525.36 3,444.47
53%
10 Construction of Road and Culvert 2,19,040 15,137.35 10,389.11
69%
11 Construction of NADEP/Vermi Compost Pit 1,36,479 404.64 286.22
71%
12 Cattle Shed 1,12,209 1,509.13 1,300.40
86%
13 Construction of Trench 1,03,016 3,755.27 3,019.14
80%
14 Solid and Liquid Waste Management 71,212 506.93 425.53
84%
15 Well Recharge 64,959 887.25 666.42
75%
16 Construction of Percolation Tank 61,016 3,011.50 2,526.85
84%
17 Construction of Recharge Pits 54,765 337.85 253.99
75%
18 Construction of Tank 46,351 2,520.62 2,119.50
84%
19 Boulder Check/Gully Plug 43,918 916.34 686.93
75%
20 Renovation of traditional water bodies 35,023 846.10 578.96
68%
21 Repair & maint of Pond/ Tank 31,838 1,367.24 1,123.24
82%
22 Construction of Crematorium 26,989 702.79 545.25
78%
23 Constr of Gabion 20,540 498.46 429.70
86%
24 Constr of Aganwadi 18,002 523.79 414.80
79%
25 Construction of Water Drain/Diversion Channel/Drainage/Field Channel 17,922 669.16 498.63
75%
26 Construction of Play field 17,012 582.25 351.07
60%
27 Works for Flood Control and Protection 16,337 957.74 812.67
85%
28 Goat Shelter 16,003 116.18 86.03
74%
29 Constr of GP Bhawan 15,949 905.26 666.84
74%
30 Culvert 15,464 577.86 513.84
89%
31 Community Sanitary Complex 12,861 67.17 54.95
82%
32 Terracing 12,825 279.71 223.12
80%
33 Roof Water Harvesting on gov/panchayat bldg 10,981 99.55 79.26
80%
34 Constr of Compound wall 8,846 240.34 211.12
88%
35 Repair & maint of Water Harvesting Structures 7,819 256.48 209.62
82%
36 Repair & Maint of Check Dam/Stop Dam 7,222 366.77 310.27
85%
37 Underground Dyke for Ground Water Recharge 6,842 260.17 208.54
80%
38 Repair & Maint of Community infrastructure 6,274 169.24 118.07
70%
39 Repair & maint of Road 6,008 300.70 257.65
86%
40 Poultry Shelter 5,614 61.72 54.42
88%
41 Other Works 4,351 73.96 48.85
66%
42 Constr of Food Grain storage 4,054 205.83 186.56
91%
43 Repair & Maint of Bund 3,321 106.92 88.78
83%
44 Constr of Kitchen Shed 3,251 15.53 12.49
80%
45 Nursery Development 3,131 110.83 36.28
33%
46 Deepening / Desilting of Flood Channels 3,075 157.01 68.28
44%
47 Repair & maint of Percolation Tank 2,991 147.79 124.32
84%
48 Construction of Embankment 2,305 155.82 131.91
85%
49 Construction of Spur 2,110 110.22 93.42
85%
50 Repaire and Maint of NADEP/Vermi Compost Pit 2,074 10.98 9.33
85%
51 Construction of Canal 1,811 78.40 61.96
79%
52 Construction of Fish Drying Infrastructure 1,801 56.19 46.08
82%
53 Construction of Other Community Building/Assets 1,762 44.26 30.10
68%
54 Construction of building/workshed for SHG 1,705 53.36 46.49
87%
55 Grass Land Development 1,415 71.04 41.71
59%
56 Bio-Fertilizer 1,328 18.27 14.06
77%
57 Renovation of Canal 1,247 33.39 24.76
74%
58 Repair & Maint of Canal 1,163 29.83 23.12
78%
59 Lining of Canal 766 39.90 32.09
80%
60 Strengthening of Embankment 674 23.75 22.38
94%
61 Fish Culture 404 18.45 14.30
78%
62 Construction of Village Haats 375 9.03 8.03
89%
63 Repair & Maint of Fish Drying Infrastructure 292 12.41 10.39
84%
64 Piggery Shelter 252 6.63 5.68
86%
65 Lift Irrigation 146 14.58 9.82
67%
66 Repair & maint of Gully Plugs 97 5.41 4.40
81%
67 Water Converation - Others 47 1.45 1.02
71%
68 Bio-gas plant 41 0.36 0.23
63%
Total 90,68,509 107,824.05 73,505.44
All 68 rows (zero-value rows hidden) ⇩ Export to Excel