Showcase — Completed Works

Rollup last refreshed: 2026-07-11 02:05:34.314168
to
to
Reset filters
Scope
Works completed
316
Sanctioned (pure scheme)
₹3.84 Cr
Expenditure since inception
₹3.28 Cr

Top new work types

Top 10 · ranked by sanction cost (Admin Config)
01
Construction of Bund
6 works
₹67.07 L sanctioned
₹64.36 L spent (96%)
02
Construction of Check Dam/Stop Dam
15 works
₹47.26 L sanctioned
₹46.31 L spent (98%)
03
Plantation
10 works
₹45.99 L sanctioned
₹28.30 L spent (62%)
04
Construction of Road and Culvert
6 works
₹44.68 L sanctioned
₹25.99 L spent (58%)
05
Construction of Percolation Tank
3 works
₹30.40 L sanctioned
₹29.28 L spent (96%)
06
Constr of Cement Concrete Roads
19 works
₹27.87 L sanctioned
₹27.37 L spent (98%)
07
Cattle Shed
37 works
₹26.09 L sanctioned
₹25.25 L spent (97%)
08
Works for Flood Control and Protection
5 works
₹21.68 L sanctioned
₹20.34 L spent (94%)
09
Construction of Water Drain/Diversion Channel/Drainage/Field Channel
2 works
₹17.33 L sanctioned
₹15.88 L spent (92%)
10
Constr of GP Bhawan
1 works
₹14.49 L sanctioned
₹9.15 L spent (63%)

Detailed breakdown (All amounts in ₹ Lakh)

By District / Block / Panchayat By New Work Type
Sr. New Work Type Completed Sanctioned Expenditure Exp. %
1 Construction of Toilets 124 5.46 5.38
99%
2 Cattle Shed 37 26.09 25.25
97%
3 Farm Pond 31 13.20 12.56
95%
4 Land Development 26 0.00 4.52
0%
5 Rural Housing 21 3.88 3.56
92%
6 Constr of Cement Concrete Roads 19 27.87 27.37
98%
7 Construction of Check Dam/Stop Dam 15 47.26 46.31
98%
8 Plantation 10 45.99 28.30
62%
9 Construction of Road and Culvert 6 44.68 25.99
58%
10 Construction of Bund 6 67.07 64.36
96%
11 Works for Flood Control and Protection 5 21.68 20.34
94%
12 Construction of Trench 5 0.00 0.85
0%
13 Construction of Percolation Tank 3 30.40 29.28
96%
14 Construction of Crematorium 2 5.31 2.19
41%
15 Construction of Water Drain/Diversion Channel/Drainage/Field Channel 2 17.33 15.88
92%
16 Construction of Play field 1 3.20 2.97
93%
17 Constr of GP Bhawan 1 14.49 9.15
63%
18 Community Sanitary Complex 1 0.43 0.42
99%
19 Strengthening of Embankment 1 9.61 2.89
30%
Total 316 383.96 327.56
All 19 rows (zero-value rows hidden) ⇩ Export to Excel