Works completed
202
Sanctioned (pure scheme)
₹2.57 Cr
Expenditure since inception
₹1.95 Cr

Top new work types

Top 10 · ranked by sanction cost (Admin Config)
01
Construction of Road and Culvert
8 works
₹53.56 L sanctioned
₹21.87 L spent (41%)
02
Construction of Check Dam/Stop Dam
6 works
₹44.62 L sanctioned
₹43.06 L spent (97%)
03
Cattle Shed
61 works
₹41.01 L sanctioned
₹31.25 L spent (76%)
04
Constr of Cement Concrete Roads
42 works
₹31.67 L sanctioned
₹29.76 L spent (94%)
05
Repair & maint of Pond/ Tank
1 works
₹17.73 L sanctioned
₹16.45 L spent (93%)
06
Construction of Water Drain/Diversion Channel/Drainage/Field Channel
1 works
₹14.99 L sanctioned
₹14.77 L spent (98%)
07
Terracing
1 works
₹14.98 L sanctioned
₹14.76 L spent (99%)
08
Plantation
4 works
₹9.63 L sanctioned
₹82,938 spent (9%)
09
Construction of Crematorium
1 works
₹7.46 L sanctioned
₹2.76 L spent (37%)
10
Land Development
6 works
₹4.19 L sanctioned
₹5.47 L spent (131%)

Detailed breakdown (All amounts in ₹ Lakh)

By District / Block / Panchayat By New Work Type
Sr. New Work Type Completed Sanctioned Expenditure Exp. %
1 Cattle Shed 61 41.01 31.25
76%
2 Constr of Cement Concrete Roads 42 31.67 29.76
94%
3 Construction of Toilets 30 3.42 1.39
41%
4 Rural Housing 14 2.20 2.20
100%
5 Farm Pond 10 3.75 4.25
113%
6 Construction of Road and Culvert 8 53.56 21.87
41%
7 Construction of NADEP/Vermi Compost Pit 6 0.16 0.16
99%
8 Land Development 6 4.19 5.47
131%
9 Construction of Check Dam/Stop Dam 6 44.62 43.06
97%
10 Plantation 4 9.63 0.83
9%
11 Deepening / Desilting of Flood Channels 3 0.80 1.32
164%
12 Works for Flood Control and Protection 2 2.22 2.06
93%
13 Underground Dyke for Ground Water Recharge 2 0.00 0.00
0%
14 Construction of Water Drain/Diversion Channel/Drainage/Field Channel 1 14.99 14.77
99%
15 Repair & maint of Pond/ Tank 1 17.73 16.45
93%
16 Community Sanitary Complex 1 0.43 0.42
98%
17 Construction of Crematorium 1 7.46 2.76
37%
18 Terracing 1 14.98 14.76
99%
19 Construction of Tank 1 0.79 0.79
99%
20 Well Recharge 1 0.63 0.59
94%
21 Construction of Play field 1 3.20 1.24
39%
Total 202 257.43 195.37