MGNREGA Works Dashboard
MGNREGA VBGRAMG MGNREGA + VBGRAMG
Admin login

Showcase — Completed Works

Rollup last refreshed: 2026-09-27 07:02:18.37299
to
to
Reset filters
Scope
Works completed
131
Sanctioned (pure scheme)
₹7.99 Cr
Expenditure since inception
₹7.29 Cr

Top new work types

Top 10 · ranked by sanction cost (Admin Config)
01
Construction of Check Dam/Stop Dam
26 works
₹3.92 Cr sanctioned
₹3.70 Cr spent (94%)
02
Boulder Check/Gully Plug
5 works
₹74.70 L sanctioned
₹65.44 L spent (88%)
03
Construction of Water Drain/Diversion Channel/Drainage/Field Channel
5 works
₹74.47 L sanctioned
₹67.99 L spent (91%)
04
Construction of Bund
4 works
₹66.04 L sanctioned
₹62.09 L spent (94%)
05
Constr of Gabion
3 works
₹44.71 L sanctioned
₹42.07 L spent (94%)
06
Construction of Road and Culvert
5 works
₹39.99 L sanctioned
₹33.78 L spent (84%)
07
Construction of Percolation Tank
2 works
₹35.61 L sanctioned
₹33.79 L spent (95%)
08
Construction of Tank
1 works
₹14.53 L sanctioned
₹13.72 L spent (94%)
09
Works for Flood Control and Protection
1 works
₹13.41 L sanctioned
₹12.77 L spent (95%)
10
Plantation
4 works
₹12.83 L sanctioned
₹3.57 L spent (28%)

Detailed breakdown (All amounts in ₹ Crore)

By District / Block / Panchayat By New Work Type
Sr. New Work Type Completed Sanctioned Expenditure Exp. %
1 Rural Housing 36 0.08 0.07
92%
2 Construction of Check Dam/Stop Dam 26 3.92 3.70
94%
3 Constr of Cement Concrete Roads 13 0.07 0.08
108%
4 Construction of Recharge Pits 9 0.02 0.02
93%
5 Cattle Shed 7 0.06 0.04
61%
6 Farm Pond 6 0.03 0.02
74%
7 Boulder Check/Gully Plug 5 0.75 0.65
88%
8 Construction of Road and Culvert 5 0.40 0.34
85%
9 Construction of Water Drain/Diversion Channel/Drainage/Field Channel 5 0.74 0.68
91%
10 Construction of Bund 4 0.66 0.62
94%
11 Plantation 4 0.13 0.04
28%
12 Constr of Gabion 3 0.45 0.42
94%
13 Construction of Percolation Tank 2 0.36 0.34
95%
14 Repair & maint of Pond/ Tank 2 0.02 0.01
63%
15 Land Development 1 0.00 0.00
49%
16 Construction of Tank 1 0.15 0.14
94%
17 Construction of Crematorium 1 0.02 0.00
2%
18 Works for Flood Control and Protection 1 0.13 0.13
95%
Total 131 7.99 7.29
All 18 rows (zero-value rows hidden) ⇩ Export to Excel