Showcase — Completed Works

Rollup last refreshed: 2026-08-14 08:34:16.66446
to
to
Reset filters
Scope
Works completed
289
Sanctioned (pure scheme)
₹9.17 Cr
Expenditure since inception
₹7.02 Cr

Top new work types

Top 10 · ranked by sanction cost (Admin Config)
01
Construction of Check Dam/Stop Dam
31 works
₹2.23 Cr sanctioned
₹1.75 Cr spent (79%)
02
Works for Flood Control and Protection
24 works
₹2.21 Cr sanctioned
₹1.57 Cr spent (71%)
03
Construction of Road and Culvert
26 works
₹1.94 Cr sanctioned
₹1.30 Cr spent (67%)
04
Construction of Trench
5 works
₹47.25 L sanctioned
₹41.73 L spent (88%)
05
Roof Water Harvesting on gov/panchayat bldg
3 works
₹44.00 L sanctioned
₹24.25 L spent (55%)
06
Plantation
16 works
₹42.72 L sanctioned
₹21.69 L spent (51%)
07
Cattle Shed
45 works
₹35.60 L sanctioned
₹31.37 L spent (88%)
08
Terracing
2 works
₹29.01 L sanctioned
₹27.61 L spent (95%)
09
Repair & Maint of Check Dam/Stop Dam
1 works
₹14.97 L sanctioned
₹14.74 L spent (98%)
10
Constr of Gabion
1 works
₹14.53 L sanctioned
₹13.22 L spent (91%)

Detailed breakdown (All amounts in ₹ Crore)

By District / Block / Panchayat By New Work Type
Sr. New Work Type Completed Sanctioned Expenditure Exp. %
1 Farm Pond 60 0.04 0.20
532%
2 Cattle Shed 45 0.36 0.31
88%
3 Rural Housing 37 0.06 0.06
100%
4 Construction of Check Dam/Stop Dam 31 2.23 1.75
79%
5 Construction of Road and Culvert 26 1.94 1.30
67%
6 Works for Flood Control and Protection 24 2.21 1.57
71%
7 Plantation 16 0.43 0.22
51%
8 Land Development 14 0.05 0.08
159%
9 Other Works 6 0.06 0.05
75%
10 Construction of Trench 5 0.47 0.42
88%
11 Construction of Crematorium 4 0.14 0.12
83%
12 Constr of Cement Concrete Roads 4 0.06 0.03
46%
13 Roof Water Harvesting on gov/panchayat bldg 3 0.44 0.24
55%
14 Construction of Well 2 0.00 0.03
0%
15 Construction of Recharge Pits 2 0.01 0.00
38%
16 Repair & maint of Pond/ Tank 2 0.01 0.01
73%
17 Terracing 2 0.29 0.28
95%
18 Grass Land Development 1 0.05 0.05
94%
19 Constr of Gabion 1 0.15 0.13
91%
20 Repair & Maint of Check Dam/Stop Dam 1 0.15 0.15
99%
21 Strengthening of Embankment 1 0.03 0.02
47%
22 Community Sanitary Complex 1 0.00 0.00
100%
23 Construction of Percolation Tank 1 0.00 0.02
0%
Total 289 9.17 7.02
All 23 rows (zero-value rows hidden) ⇩ Export to Excel