MGNREGA Works Dashboard
MGNREGA VBGRAMG MGNREGA + VBGRAMG
Admin login

Showcase — Completed Works

Rollup last refreshed: 2026-08-16 10:42:45.210984
to
to
Reset filters
Scope
Works completed
424
Sanctioned (pure scheme)
₹13.40 Cr
Expenditure since inception
₹12.10 Cr

Top new work types

Top 10 · ranked by sanction cost (Admin Config)
01
Construction of Check Dam/Stop Dam
47 works
₹5.00 Cr sanctioned
₹4.83 Cr spent (97%)
02
Construction of Bund
27 works
₹4.18 Cr sanctioned
₹3.78 Cr spent (90%)
03
Boulder Check/Gully Plug
7 works
₹97.28 L sanctioned
₹88.53 L spent (91%)
04
Cattle Shed
57 works
₹81.48 L sanctioned
₹54.52 L spent (67%)
05
Farm Pond
118 works
₹45.27 L sanctioned
₹53.59 L spent (118%)
06
Construction of Water Drain/Diversion Channel/Drainage/Field Channel
3 works
₹40.98 L sanctioned
₹27.37 L spent (67%)
07
Construction of Road and Culvert
9 works
₹34.56 L sanctioned
₹18.36 L spent (53%)
08
Plantation
5 works
₹26.29 L sanctioned
₹17.00 L spent (65%)
09
Construction of Spur
2 works
₹24.10 L sanctioned
₹20.29 L spent (84%)
10
Repair & Maint of Check Dam/Stop Dam
1 works
₹14.63 L sanctioned
₹14.62 L spent (100%)

Detailed breakdown (All amounts in ₹ Crore)

By District / Block / Panchayat By New Work Type
Sr. New Work Type Completed Sanctioned Expenditure Exp. %
1 Farm Pond 118 0.45 0.54
118%
2 Construction of Toilets 79 0.02 0.03
112%
3 Cattle Shed 57 0.81 0.55
67%
4 Construction of Check Dam/Stop Dam 47 5.00 4.83
97%
5 Land Development 33 0.01 0.16
1116%
6 Construction of Bund 27 4.18 3.78
90%
7 Rural Housing 21 0.03 0.03
103%
8 Construction of Road and Culvert 9 0.35 0.18
53%
9 Boulder Check/Gully Plug 7 0.97 0.89
91%
10 Plantation 5 0.26 0.17
65%
11 Constr of Cement Concrete Roads 5 0.08 0.03
41%
12 Construction of Water Drain/Diversion Channel/Drainage/Field Channel 3 0.41 0.27
67%
13 Construction of NADEP/Vermi Compost Pit 3 0.13 0.11
86%
14 Construction of Spur 2 0.24 0.20
84%
15 Community Sanitary Complex 2 0.01 0.01
83%
16 Deepening / Desilting of Flood Channels 1 0.14 0.07
47%
17 Construction of Crematorium 1 0.06 0.02
38%
18 Terracing 1 0.07 0.07
93%
19 Repair & maint of Pond/ Tank 1 0.01 0.00
55%
20 Repair & Maint of Check Dam/Stop Dam 1 0.15 0.15
100%
21 Renovation of traditional water bodies 1 0.00 0.01
0%
Total 424 13.40 12.10
All 21 rows (zero-value rows hidden) ⇩ Export to Excel