Showcase — Completed Works

Rollup last refreshed: 2026-07-11 02:05:34.314168
to
to
Reset filters
Scope
Works completed
170
Sanctioned (pure scheme)
₹10.56 Cr
Expenditure since inception
₹9.54 Cr

Top new work types

Top 10 · ranked by sanction cost (Admin Config)
01
Plantation
19 works
₹2.61 Cr sanctioned
₹2.33 Cr spent (89%)
02
Construction of Check Dam/Stop Dam
14 works
₹1.81 Cr sanctioned
₹1.74 Cr spent (97%)
03
Repair & maint of Pond/ Tank
8 works
₹1.19 Cr sanctioned
₹1.17 Cr spent (98%)
04
Repair & Maint of Check Dam/Stop Dam
6 works
₹89.12 L sanctioned
₹87.93 L spent (99%)
05
Boulder Check/Gully Plug
6 works
₹88.16 L sanctioned
₹70.50 L spent (80%)
06
Construction of Road and Culvert
10 works
₹78.63 L sanctioned
₹69.25 L spent (88%)
07
Construction of Bund
8 works
₹48.62 L sanctioned
₹44.48 L spent (91%)
08
Works for Flood Control and Protection
4 works
₹47.42 L sanctioned
₹32.14 L spent (68%)
09
Terracing
3 works
₹37.08 L sanctioned
₹34.00 L spent (92%)
10
Constr of Cement Concrete Roads
11 works
₹20.86 L sanctioned
₹12.62 L spent (61%)

Detailed breakdown (All amounts in ₹ Crore)

By District / Block / Panchayat By New Work Type
Sr. New Work Type Completed Sanctioned Expenditure Exp. %
1 Rural Housing 37 0.06 0.06
96%
2 Plantation 19 2.61 2.33
89%
3 Farm Pond 17 0.01 0.05
632%
4 Construction of Check Dam/Stop Dam 14 1.81 1.74
97%
5 Constr of Cement Concrete Roads 11 0.21 0.13
61%
6 Cattle Shed 10 0.08 0.08
95%
7 Construction of Road and Culvert 10 0.79 0.69
88%
8 Construction of Bund 8 0.49 0.44
92%
9 Repair & maint of Pond/ Tank 8 1.19 1.17
99%
10 Repair & Maint of Check Dam/Stop Dam 6 0.89 0.88
99%
11 Boulder Check/Gully Plug 6 0.88 0.70
80%
12 Well Recharge 5 0.07 0.05
70%
13 Works for Flood Control and Protection 4 0.47 0.32
68%
14 Construction of Recharge Pits 4 0.03 0.02
66%
15 Terracing 3 0.37 0.34
92%
16 Land Development 2 0.00 0.01
0%
17 Construction of Trench 1 0.13 0.12
92%
18 Construction of Tank 1 0.15 0.14
95%
19 Constr of Gabion 1 0.12 0.05
45%
20 Culvert 1 0.03 0.03
97%
21 Construction of Spur 1 0.15 0.14
96%
22 Construction of Play field 1 0.02 0.02
99%
Total 170 10.56 9.54
All 22 rows (zero-value rows hidden) ⇩ Export to Excel