MGNREGA Works Dashboard
MGNREGA VBGRAMG MGNREGA + VBGRAMG
Admin login

Showcase — Completed Works

Rollup last refreshed: 2026-08-13 11:13:06.012489
to
to
Reset filters
Scope
Works completed
205
Sanctioned (pure scheme)
₹8.69 Cr
Expenditure since inception
₹7.59 Cr

Top new work types

Top 10 · ranked by sanction cost (Admin Config)
01
Plantation
20 works
₹2.46 Cr sanctioned
₹2.31 Cr spent (94%)
02
Construction of Road and Culvert
24 works
₹1.65 Cr sanctioned
₹1.08 Cr spent (66%)
03
Works for Flood Control and Protection
9 works
₹1.09 Cr sanctioned
₹92.54 L spent (85%)
04
Construction of Tank
6 works
₹86.22 L sanctioned
₹76.36 L spent (89%)
05
Construction of Bund
5 works
₹63.45 L sanctioned
₹59.24 L spent (93%)
06
Construction of Water Drain/Diversion Channel/Drainage/Field Channel
3 works
₹42.70 L sanctioned
₹39.45 L spent (92%)
07
Repair & Maint of Check Dam/Stop Dam
2 works
₹29.87 L sanctioned
₹22.16 L spent (74%)
08
Cattle Shed
35 works
₹28.60 L sanctioned
₹22.84 L spent (80%)
09
Deepening / Desilting of Flood Channels
4 works
₹22.10 L sanctioned
₹20.86 L spent (94%)
10
Construction of Embankment
1 works
₹14.94 L sanctioned
₹13.95 L spent (93%)

Detailed breakdown (All amounts in ₹ Crore)

By District / Block / Panchayat By New Work Type
Sr. New Work Type Completed Sanctioned Expenditure Exp. %
1 Rural Housing 44 0.07 0.07
99%
2 Cattle Shed 35 0.29 0.23
80%
3 Construction of Road and Culvert 24 1.65 1.08
66%
4 Plantation 20 2.46 2.31
94%
5 Farm Pond 20 0.02 0.09
405%
6 Land Development 17 0.00 0.04
0%
7 Works for Flood Control and Protection 9 1.09 0.93
85%
8 Construction of Tank 6 0.86 0.76
89%
9 Construction of Check Dam/Stop Dam 5 0.11 0.17
151%
10 Construction of Bund 5 0.63 0.59
93%
11 Deepening / Desilting of Flood Channels 4 0.22 0.21
94%
12 Renovation of traditional water bodies 3 0.00 0.07
0%
13 Construction of Water Drain/Diversion Channel/Drainage/Field Channel 3 0.43 0.39
92%
14 Community Sanitary Complex 2 0.01 0.01
86%
15 Repair & Maint of Check Dam/Stop Dam 2 0.30 0.22
74%
16 Construction of Play field 1 0.04 0.03
75%
17 Construction of Percolation Tank 1 0.08 0.04
46%
18 Constr of GP Bhawan 1 0.14 0.10
67%
19 Construction of Embankment 1 0.15 0.14
93%
20 Repair & maint of Water Harvesting Structures 1 0.12 0.10
78%
21 Constr of Cement Concrete Roads 1 0.00 0.01
0%
Total 205 8.69 7.59
All 21 rows (zero-value rows hidden) ⇩ Export to Excel