Works completed
175
Sanctioned (pure scheme)
₹10.06 Cr
Expenditure since inception
₹8.84 Cr

Top new work types

Top 10 · ranked by sanction cost (Admin Config)
01
Construction of Road and Culvert
32 works
₹2.72 Cr sanctioned
₹2.48 Cr spent (91%)
02
Construction of Water Drain/Diversion Channel/Drainage/Field Channel
14 works
₹1.97 Cr sanctioned
₹1.85 Cr spent (94%)
03
Works for Flood Control and Protection
18 works
₹1.73 Cr sanctioned
₹1.40 Cr spent (81%)
04
Construction of Check Dam/Stop Dam
19 works
₹1.08 Cr sanctioned
₹1.01 Cr spent (93%)
05
Plantation
5 works
₹47.04 L sanctioned
₹38.70 L spent (82%)
06
Terracing
3 works
₹42.40 L sanctioned
₹39.35 L spent (93%)
07
Construction of Bund
3 works
₹41.41 L sanctioned
₹31.60 L spent (76%)
08
Cattle Shed
32 works
₹25.60 L sanctioned
₹24.65 L spent (96%)
09
Construction of Embankment
2 works
₹24.22 L sanctioned
₹16.19 L spent (67%)
10
Constr of Cement Concrete Roads
11 works
₹15.23 L sanctioned
₹8.60 L spent (56%)

Detailed breakdown (All amounts in ₹ Crore)

By District / Block / Panchayat By New Work Type
Sr. New Work Type Completed Sanctioned Expenditure Exp. %
1 Cattle Shed 32 0.26 0.25
96%
2 Construction of Road and Culvert 32 2.72 2.48
91%
3 Construction of Check Dam/Stop Dam 19 1.08 1.01
93%
4 Works for Flood Control and Protection 18 1.73 1.40
81%
5 Rural Housing 14 0.02 0.02
95%
6 Construction of Water Drain/Diversion Channel/Drainage/Field Channel 14 1.97 1.85
94%
7 Constr of Cement Concrete Roads 11 0.15 0.09
57%
8 Construction of Recharge Pits 8 0.02 0.01
53%
9 Farm Pond 7 0.15 0.14
95%
10 Plantation 5 0.47 0.39
82%
11 Construction of Bund 3 0.41 0.32
76%
12 Terracing 3 0.42 0.39
93%
13 Construction of Embankment 2 0.24 0.16
67%
14 Constr of Aganwadi 1 0.02 0.02
83%
15 Repair & maint of Water Harvesting Structures 1 0.09 0.05
50%
16 Constr of Gabion 1 0.15 0.14
95%
17 Construction of Tank 1 0.09 0.07
82%
18 Construction of Crematorium 1 0.02 0.02
98%
19 Bio-Fertilizer 1 0.03 0.02
84%
20 Construction of Play field 1 0.00 0.01
0%
Total 175 10.06 8.84