Showcase — Completed Works
Rollup last refreshed: 2026-08-16 10:42:45.210984
Top new work types
Top 10 · ranked by sanction cost (Admin Config)
01
Construction of Road and Culvert
42 works
₹2.68 Cr sanctioned
₹2.28 Cr spent (85%)
02
Construction of Check Dam/Stop Dam
20 works
₹2.39 Cr sanctioned
₹2.19 Cr spent (91%)
03
Plantation
20 works
₹2.39 Cr sanctioned
₹1.90 Cr spent (80%)
04
Construction of Water Drain/Diversion Channel/Drainage/Field Channel
7 works
₹1.43 Cr sanctioned
₹1.22 Cr spent (85%)
05
Construction of Tank
9 works
₹1.24 Cr sanctioned
₹1.17 Cr spent (94%)
06
Construction of Bund
8 works
₹84.27 L sanctioned
₹79.47 L spent (94%)
07
Repair & maint of Pond/ Tank
7 works
₹81.36 L sanctioned
₹68.61 L spent (84%)
08
Constr of Cement Concrete Roads
4 works
₹70.87 L sanctioned
₹73.31 L spent (103%)
09
Works for Flood Control and Protection
3 works
₹47.16 L sanctioned
₹43.57 L spent (92%)
10
Cattle Shed
25 works
₹46.92 L sanctioned
₹36.67 L spent (78%)