MGNREGA Works Dashboard
Admin login

Showcase — Completed Works

Rollup last refreshed: 2026-07-11 02:05:34.314168
to
to
Reset filters
Scope
Works completed
151
Sanctioned (pure scheme)
₹6.74 Cr
Expenditure since inception
₹6.02 Cr

Top new work types

Top 10 · ranked by sanction cost (Admin Config)
01
Works for Flood Control and Protection
19 works
₹2.28 Cr sanctioned
₹1.87 Cr spent (82%)
02
Construction of Road and Culvert
18 works
₹1.14 Cr sanctioned
₹1.02 Cr spent (90%)
03
Construction of Check Dam/Stop Dam
10 works
₹98.83 L sanctioned
₹91.58 L spent (93%)
04
Cattle Shed
46 works
₹64.52 L sanctioned
₹60.47 L spent (94%)
05
Construction of Water Drain/Diversion Channel/Drainage/Field Channel
4 works
₹42.77 L sanctioned
₹40.10 L spent (94%)
06
Construction of Bund
2 works
₹24.51 L sanctioned
₹22.55 L spent (92%)
07
Construction of Percolation Tank
2 works
₹19.82 L sanctioned
₹15.41 L spent (78%)
08
Strengthening of Embankment
2 works
₹18.35 L sanctioned
₹17.53 L spent (96%)
09
Construction of Tank
3 works
₹14.09 L sanctioned
₹11.79 L spent (84%)
10
Construction of Spur
1 works
₹12.00 L sanctioned
₹10.84 L spent (90%)

Detailed breakdown (All amounts in ₹ Crore)

By District / Block / Panchayat By New Work Type
Sr. New Work Type Completed Sanctioned Expenditure Exp. %
1 Cattle Shed 46 0.65 0.60
94%
2 Works for Flood Control and Protection 19 2.28 1.87
82%
3 Construction of Road and Culvert 18 1.14 1.02
90%
4 Rural Housing 17 0.03 0.03
98%
5 Construction of Check Dam/Stop Dam 10 0.99 0.92
93%
6 Plantation 8 0.05 0.06
118%
7 Constr of Cement Concrete Roads 6 0.05 0.04
89%
8 Farm Pond 5 0.03 0.02
72%
9 Construction of Water Drain/Diversion Channel/Drainage/Field Channel 4 0.43 0.40
94%
10 Construction of Tank 3 0.14 0.12
84%
11 Construction of Crematorium 2 0.09 0.08
90%
12 Deepening / Desilting of Flood Channels 2 0.04 0.09
219%
13 Construction of Percolation Tank 2 0.20 0.15
78%
14 Strengthening of Embankment 2 0.18 0.18
96%
15 Construction of Bund 2 0.25 0.23
92%
16 Community Sanitary Complex 1 0.00 0.00
100%
17 Construction of Spur 1 0.12 0.11
90%
18 Land Development 1 0.00 0.04
0%
19 Constr of GP Bhawan 1 0.06 0.06
98%
20 Construction of Play field 1 0.03 0.01
31%
Total 151 6.74 6.02