| Sr. | New Work Type | Completed | Sanctioned | Expenditure | Exp. % |
|---|---|---|---|---|---|
| 1 | Rural Housing | 86 | 0.14 | 0.13 | 98% |
| 2 | Construction of Check Dam/Stop Dam | 49 | 6.90 | 6.42 | 93% |
| 3 | Cattle Shed | 39 | 0.32 | 0.29 | 91% |
| 4 | Land Development | 22 | 0.13 | 0.10 | 73% |
| 5 | Plantation | 18 | 0.59 | 0.18 | 30% |
| 6 | Construction of Road and Culvert | 16 | 0.68 | 0.47 | 69% |
| 7 | Construction of Bund | 12 | 1.55 | 1.02 | 66% |
| 8 | Construction of Trench | 7 | 0.01 | 0.01 | 125% |
| 9 | Constr of Cement Concrete Roads | 6 | 0.05 | 0.03 | 55% |
| 10 | Boulder Check/Gully Plug | 5 | 0.41 | 0.32 | 79% |
| 11 | Construction of Percolation Tank | 4 | 0.27 | 0.25 | 92% |
| 12 | Works for Flood Control and Protection | 3 | 0.20 | 0.15 | 77% |
| 13 | Construction of Crematorium | 2 | 0.04 | 0.04 | 100% |
| 14 | Deepening / Desilting of Flood Channels | 1 | 0.10 | 0.08 | 77% |
| 15 | Farm Pond | 1 | 0.00 | 0.00 | 0% |
| 16 | Construction of Tank | 1 | 0.15 | 0.14 | 93% |
| 17 | Construction of Water Drain/Diversion Channel/Drainage/Field Channel | 1 | 0.03 | 0.02 | 84% |
| 18 | Constr of Gabion | 1 | 0.15 | 0.15 | 99% |
| Total | 274 | 11.70 | 9.79 |