Showcase — Completed Works

Rollup last refreshed: 2026-07-11 02:05:34.314168
to
to
Reset filters
Scope
Works completed
405
Sanctioned (pure scheme)
₹2.94 Cr
Expenditure since inception
₹2.43 Cr

Top new work types

Top 10 · ranked by sanction cost (Admin Config)
01
Construction of Road and Culvert
6 works
₹66.95 L sanctioned
₹46.80 L spent (70%)
02
Constr of Cement Concrete Roads
52 works
₹47.63 L sanctioned
₹45.28 L spent (95%)
03
Works for Flood Control and Protection
16 works
₹37.97 L sanctioned
₹31.95 L spent (84%)
04
Cattle Shed
56 works
₹24.75 L sanctioned
₹23.40 L spent (95%)
05
Construction of Bund
22 works
₹20.99 L sanctioned
₹17.84 L spent (85%)
06
Repair & maint of Pond/ Tank
2 works
₹15.45 L sanctioned
₹11.25 L spent (73%)
07
Construction of Trench
1 works
₹14.51 L sanctioned
₹13.22 L spent (91%)
08
Construction of Percolation Tank
3 works
₹11.60 L sanctioned
₹8.68 L spent (75%)
09
Construction of Embankment
2 works
₹11.15 L sanctioned
₹9.24 L spent (83%)
10
Construction of Toilets
219 works
₹9.86 L sanctioned
₹9.62 L spent (98%)

Detailed breakdown (All amounts in ₹ Lakh)

By District / Block / Panchayat By New Work Type
Sr. New Work Type Completed Sanctioned Expenditure Exp. %
1 Construction of Toilets 219 9.86 9.62
98%
2 Cattle Shed 56 24.75 23.40
95%
3 Constr of Cement Concrete Roads 52 47.63 45.28
95%
4 Construction of Bund 22 20.99 17.84
85%
5 Works for Flood Control and Protection 16 37.97 31.95
84%
6 Farm Pond 7 6.76 4.90
72%
7 Construction of Road and Culvert 6 66.95 46.80
70%
8 Construction of Check Dam/Stop Dam 4 7.96 6.91
87%
9 Construction of Percolation Tank 3 11.60 8.68
75%
10 Rural Housing 3 0.47 0.46
97%
11 Construction of Crematorium 2 4.90 4.88
100%
12 Repair & maint of Pond/ Tank 2 15.45 11.25
73%
13 Construction of Embankment 2 11.15 9.24
83%
14 Renovation of traditional water bodies 2 0.97 2.00
206%
15 Plantation 2 7.61 2.31
30%
16 Community Sanitary Complex 1 0.43 0.43
100%
17 Constr of GP Bhawan 1 0.43 0.43
100%
18 Construction of NADEP/Vermi Compost Pit 1 0.30 0.92
307%
19 Construction of Trench 1 14.51 13.22
91%
20 Construction of Water Drain/Diversion Channel/Drainage/Field Channel 1 0.36 0.21
58%
21 Culvert 1 1.05 0.58
55%
22 Terracing 1 2.21 1.84
83%
Total 405 294.32 243.15
All 22 rows (zero-value rows hidden) ⇩ Export to Excel