MGNREGA Works Dashboard
Admin login

Showcase — Completed Works

Rollup last refreshed: 2026-07-11 02:05:34.314168
to
to
Reset filters
Scope
Works completed
355
Sanctioned (pure scheme)
₹9.61 Cr
Expenditure since inception
₹8.40 Cr

Top new work types

Top 10 · ranked by sanction cost (Admin Config)
01
Construction of Road and Culvert
17 works
₹1.59 Cr sanctioned
₹1.42 Cr spent (89%)
02
Cattle Shed
99 works
₹1.22 Cr sanctioned
₹1.19 Cr spent (97%)
03
Construction of Bund
10 works
₹1.09 Cr sanctioned
₹1.03 Cr spent (94%)
04
Construction of Trench
9 works
₹1.03 Cr sanctioned
₹98.29 L spent (95%)
05
Farm Pond
42 works
₹82.61 L sanctioned
₹72.95 L spent (88%)
06
Works for Flood Control and Protection
12 works
₹73.54 L sanctioned
₹54.84 L spent (75%)
07
Construction of Tank
4 works
₹50.31 L sanctioned
₹44.28 L spent (88%)
08
Constr of Cement Concrete Roads
23 works
₹48.45 L sanctioned
₹42.21 L spent (87%)
09
Construction of Percolation Tank
3 works
₹40.76 L sanctioned
₹39.25 L spent (96%)
10
Construction of Check Dam/Stop Dam
3 works
₹40.17 L sanctioned
₹26.09 L spent (65%)

Detailed breakdown (All amounts in ₹ Crore)

By District / Block / Panchayat By New Work Type
Sr. New Work Type Completed Sanctioned Expenditure Exp. %
1 Cattle Shed 99 1.22 1.19
97%
2 Construction of NADEP/Vermi Compost Pit 51 0.07 0.07
91%
3 Farm Pond 42 0.83 0.73
88%
4 Land Development 35 0.32 0.24
74%
5 Rural Housing 34 0.05 0.05
96%
6 Constr of Cement Concrete Roads 23 0.48 0.42
87%
7 Construction of Road and Culvert 17 1.59 1.42
89%
8 Works for Flood Control and Protection 12 0.74 0.55
75%
9 Construction of Bund 10 1.09 1.03
94%
10 Construction of Trench 9 1.03 0.98
95%
11 Construction of Tank 4 0.50 0.44
88%
12 Construction of Check Dam/Stop Dam 3 0.40 0.26
65%
13 Construction of Percolation Tank 3 0.41 0.39
96%
14 Plantation 2 0.07 0.00
7%
15 Construction of Crematorium 2 0.17 0.17
98%
16 Renovation of traditional water bodies 2 0.05 0.03
61%
17 Constr of Gabion 1 0.14 0.14
98%
18 Construction of Play field 1 0.15 0.15
98%
19 Constr of GP Bhawan 1 0.05 0.04
75%
20 Construction of Water Drain/Diversion Channel/Drainage/Field Channel 1 0.03 0.03
96%
21 Grass Land Development 1 0.15 0.05
35%
22 Community Sanitary Complex 1 0.00 0.00
89%
23 Well Recharge 1 0.05 0.01
13%
Total 355 9.61 8.40
All 23 rows (zero-value rows hidden) ⇩ Export to Excel