Showcase — Completed Works
Rollup last refreshed: 2026-07-11 02:05:34.314168
Top new work types
Top 10 · ranked by sanction cost (Admin Config)
01
Construction of Road and Culvert
23 works
₹1.69 Cr sanctioned
₹1.55 Cr spent (92%)
02
Works for Flood Control and Protection
19 works
₹79.84 L sanctioned
₹73.37 L spent (92%)
03
Constr of Cement Concrete Roads
44 works
₹43.89 L sanctioned
₹35.36 L spent (81%)
04
Cattle Shed
39 works
₹39.92 L sanctioned
₹37.55 L spent (94%)
05
Construction of Check Dam/Stop Dam
4 works
₹33.71 L sanctioned
₹33.01 L spent (98%)
06
Construction of Embankment
5 works
₹33.40 L sanctioned
₹32.90 L spent (98%)
07
Deepening / Desilting of Flood Channels
4 works
₹28.45 L sanctioned
₹28.00 L spent (98%)
08
Goat Shelter
1 works
₹27.72 L sanctioned
₹28.24 L spent (102%)
09
Constr of Compound wall
2 works
₹25.37 L sanctioned
₹10.03 L spent (40%)
10
Farm Pond
13 works
₹16.94 L sanctioned
₹5.16 L spent (30%)