MGNREGA Works Dashboard
Admin login

Showcase — Completed Works

Rollup last refreshed: 2026-07-11 02:05:34.314168
to
to
Reset filters
Scope
Works completed
320
Sanctioned (pure scheme)
₹5.70 Cr
Expenditure since inception
₹4.99 Cr

Top new work types

Top 10 · ranked by sanction cost (Admin Config)
01
Construction of Road and Culvert
23 works
₹1.69 Cr sanctioned
₹1.55 Cr spent (92%)
02
Works for Flood Control and Protection
19 works
₹79.84 L sanctioned
₹73.37 L spent (92%)
03
Constr of Cement Concrete Roads
44 works
₹43.89 L sanctioned
₹35.36 L spent (81%)
04
Cattle Shed
39 works
₹39.92 L sanctioned
₹37.55 L spent (94%)
05
Construction of Check Dam/Stop Dam
4 works
₹33.71 L sanctioned
₹33.01 L spent (98%)
06
Construction of Embankment
5 works
₹33.40 L sanctioned
₹32.90 L spent (98%)
07
Deepening / Desilting of Flood Channels
4 works
₹28.45 L sanctioned
₹28.00 L spent (98%)
08
Goat Shelter
1 works
₹27.72 L sanctioned
₹28.24 L spent (102%)
09
Constr of Compound wall
2 works
₹25.37 L sanctioned
₹10.03 L spent (40%)
10
Farm Pond
13 works
₹16.94 L sanctioned
₹5.16 L spent (30%)

Detailed breakdown (All amounts in ₹ Crore)

By District / Block / Panchayat By New Work Type
Sr. New Work Type Completed Sanctioned Expenditure Exp. %
1 Rural Housing 52 0.09 0.08
94%
2 Constr of Cement Concrete Roads 44 0.44 0.35
81%
3 Cattle Shed 39 0.40 0.38
94%
4 Solid and Liquid Waste Management 36 0.03 0.02
84%
5 Construction of Toilets 24 0.09 0.09
97%
6 Construction of Road and Culvert 23 1.69 1.55
92%
7 Works for Flood Control and Protection 19 0.80 0.73
92%
8 Boulder Check/Gully Plug 18 0.07 0.06
96%
9 Land Development 15 0.04 0.02
55%
10 Farm Pond 13 0.17 0.05
30%
11 Construction of Canal 7 0.11 0.09
81%
12 Construction of Embankment 5 0.33 0.33
99%
13 Deepening / Desilting of Flood Channels 4 0.28 0.28
98%
14 Construction of Check Dam/Stop Dam 4 0.34 0.33
98%
15 Construction of NADEP/Vermi Compost Pit 4 0.01 0.01
99%
16 Plantation 2 0.07 0.00
2%
17 Construction of Bund 2 0.01 0.01
95%
18 Community Sanitary Complex 2 0.01 0.01
100%
19 Constr of Compound wall 2 0.25 0.10
40%
20 Construction of Crematorium 1 0.02 0.02
99%
21 Goat Shelter 1 0.28 0.28
102%
22 Construction of Play field 1 0.04 0.04
106%
23 Renovation of traditional water bodies 1 0.14 0.14
99%
24 Constr of Food Grain storage 1 0.00 0.00
100%
Total 320 5.70 4.99
All 24 rows (zero-value rows hidden) ⇩ Export to Excel