MGNREGA Works Dashboard
Admin login

Showcase — Completed Works

Rollup last refreshed: 2026-07-11 02:05:34.314168
to
to
Reset filters
Scope
Works completed
127
Sanctioned (pure scheme)
₹3.97 Cr
Expenditure since inception
₹3.32 Cr

Top new work types

Top 10 · ranked by sanction cost (Admin Config)
01
Construction of Water Drain/Diversion Channel/Drainage/Field Channel
10 works
₹1.16 Cr sanctioned
₹1.01 Cr spent (87%)
02
Works for Flood Control and Protection
10 works
₹89.33 L sanctioned
₹69.77 L spent (78%)
03
Construction of Road and Culvert
4 works
₹66.71 L sanctioned
₹69.76 L spent (105%)
04
Construction of Canal
9 works
₹52.50 L sanctioned
₹38.89 L spent (74%)
05
Land Development
3 works
₹32.91 L sanctioned
₹27.34 L spent (83%)
06
Lining of Canal
3 works
₹17.14 L sanctioned
₹13.04 L spent (76%)
07
Plantation
2 works
₹6.70 L sanctioned
₹70,292 spent (10%)
08
Constr of Cement Concrete Roads
14 works
₹4.78 L sanctioned
₹3.34 L spent (70%)
09
Rural Housing
26 works
₹4.06 L sanctioned
₹3.58 L spent (88%)
10
Construction of Play field
1 works
₹1.87 L sanctioned
₹55,728 spent (30%)

Detailed breakdown (All amounts in ₹ Crore)

By District / Block / Panchayat By New Work Type
Sr. New Work Type Completed Sanctioned Expenditure Exp. %
1 Construction of Toilets 33 0.01 0.01
58%
2 Rural Housing 26 0.04 0.04
88%
3 Constr of Cement Concrete Roads 14 0.05 0.03
70%
4 Construction of Water Drain/Diversion Channel/Drainage/Field Channel 10 1.16 1.01
87%
5 Works for Flood Control and Protection 10 0.89 0.70
78%
6 Construction of Canal 9 0.52 0.39
74%
7 Construction of Trench 5 0.01 0.01
100%
8 Solid and Liquid Waste Management 5 0.00 0.00
46%
9 Construction of Road and Culvert 4 0.67 0.70
105%
10 Land Development 3 0.33 0.27
83%
11 Lining of Canal 3 0.17 0.13
76%
12 Plantation 2 0.07 0.01
11%
13 Construction of Check Dam/Stop Dam 1 0.00 0.00
95%
14 Construction of Play field 1 0.02 0.01
30%
15 Construction of Crematorium 1 0.02 0.02
104%
Total 127 3.97 3.32
All 15 rows (zero-value rows hidden) ⇩ Export to Excel