Showcase — Completed Works

Rollup last refreshed: 2026-08-08 07:29:29.870156
to
to
Reset filters
Scope
Works completed
84
Sanctioned (pure scheme)
₹1.71 Cr
Expenditure since inception
₹1.41 Cr

Top new work types

Top 10 · ranked by sanction cost (Admin Config)
01
Construction of Check Dam/Stop Dam
4 works
₹44.35 L sanctioned
₹42.51 L spent (96%)
02
Construction of Road and Culvert
2 works
₹24.38 L sanctioned
₹21.87 L spent (90%)
03
Construction of Water Drain/Diversion Channel/Drainage/Field Channel
3 works
₹15.88 L sanctioned
₹13.64 L spent (86%)
04
Construction of Crematorium
2 works
₹14.56 L sanctioned
₹11.75 L spent (81%)
05
Works for Flood Control and Protection
1 works
₹13.61 L sanctioned
₹8.90 L spent (65%)
06
Constr of Cement Concrete Roads
11 works
₹10.29 L sanctioned
₹10.83 L spent (105%)
07
Construction of Trench
2 works
₹10.07 L sanctioned
₹9.57 L spent (95%)
08
Plantation
3 works
₹10.05 L sanctioned
₹70,512 spent (7%)
09
Construction of Play field
2 works
₹6.40 L sanctioned
₹2.96 L spent (46%)
10
Cattle Shed
8 works
₹5.67 L sanctioned
₹5.43 L spent (96%)

Detailed breakdown (All amounts in ₹ Lakh)

By District / Block / Panchayat By New Work Type
Sr. New Work Type Completed Sanctioned Expenditure Exp. %
1 Rural Housing 24 3.81 3.44
90%
2 Constr of Cement Concrete Roads 11 10.29 10.83
105%
3 Cattle Shed 8 5.67 5.43
96%
4 Land Development 6 1.52 1.96
130%
5 Construction of Bund 4 1.75 1.18
68%
6 Construction of Check Dam/Stop Dam 4 44.35 42.51
96%
7 Construction of Water Drain/Diversion Channel/Drainage/Field Channel 3 15.88 13.64
86%
8 Repair & maint of Pond/ Tank 3 0.41 0.20
49%
9 Plantation 3 10.05 0.71
7%
10 Construction of NADEP/Vermi Compost Pit 3 0.58 0.19
33%
11 Construction of Road and Culvert 2 24.38 21.87
90%
12 Construction of Play field 2 6.40 2.96
46%
13 Construction of Crematorium 2 14.56 11.75
81%
14 Construction of Trench 2 10.07 9.57
95%
15 Works for Flood Control and Protection 1 13.61 8.90
65%
16 Construction of Canal 1 1.53 1.28
84%
17 Construction of Tank 1 1.88 1.37
73%
18 Construction of Toilets 1 0.10 0.10
100%
19 Culvert 1 1.73 1.71
99%
20 Lining of Canal 1 1.53 0.90
59%
21 Solid and Liquid Waste Management 1 0.45 0.16
35%
Total 84 170.55 140.65
All 21 rows (zero-value rows hidden) ⇩ Export to Excel