MGNREGA Works Dashboard
Admin login

Showcase — Completed Works

Rollup last refreshed: 2026-08-06 11:18:52.132218
to
to
Reset filters
Scope
Works completed
162
Sanctioned (pure scheme)
₹5.00 Cr
Expenditure since inception
₹3.49 Cr

Top new work types

Top 10 · ranked by sanction cost (Admin Config)
01
Construction of Trench
11 works
₹1.34 Cr sanctioned
₹90.56 L spent (67%)
02
Construction of Tank
6 works
₹70.95 L sanctioned
₹45.56 L spent (64%)
03
Construction of Check Dam/Stop Dam
16 works
₹39.57 L sanctioned
₹29.37 L spent (74%)
04
Construction of Road and Culvert
4 works
₹37.12 L sanctioned
₹34.34 L spent (93%)
05
Construction of Water Drain/Diversion Channel/Drainage/Field Channel
4 works
₹35.90 L sanctioned
₹22.60 L spent (63%)
06
Works for Flood Control and Protection
4 works
₹32.05 L sanctioned
₹21.71 L spent (68%)
07
Land Development
21 works
₹24.41 L sanctioned
₹16.02 L spent (66%)
08
Farm Pond
7 works
₹24.17 L sanctioned
₹18.80 L spent (78%)
09
Construction of Bund
11 works
₹24.07 L sanctioned
₹19.35 L spent (80%)
10
Plantation
8 works
₹22.01 L sanctioned
₹3.80 L spent (17%)

Detailed breakdown (All amounts in ₹ Crore)

By District / Block / Panchayat By New Work Type
Sr. New Work Type Completed Sanctioned Expenditure Exp. %
1 Rural Housing 22 0.04 0.04
89%
2 Land Development 21 0.24 0.16
66%
3 Constr of Cement Concrete Roads 19 0.16 0.15
90%
4 Cattle Shed 17 0.13 0.08
60%
5 Construction of Check Dam/Stop Dam 16 0.40 0.29
74%
6 Construction of Bund 11 0.24 0.19
80%
7 Construction of Trench 11 1.34 0.91
68%
8 Plantation 8 0.22 0.04
17%
9 Farm Pond 7 0.24 0.19
78%
10 Construction of Tank 6 0.71 0.46
64%
11 Construction of Water Drain/Diversion Channel/Drainage/Field Channel 4 0.36 0.23
63%
12 Construction of Road and Culvert 4 0.37 0.34
93%
13 Works for Flood Control and Protection 4 0.32 0.22
68%
14 Construction of Crematorium 3 0.05 0.05
100%
15 Constr of Aganwadi 2 0.07 0.07
99%
16 Construction of Play field 2 0.07 0.07
100%
17 Constr of Food Grain storage 1 0.00 0.00
20%
18 Construction of Recharge Pits 1 0.00 0.00
86%
19 Construction of NADEP/Vermi Compost Pit 1 0.00 0.00
96%
20 Construction of Well 1 0.02 0.00
19%
21 Solid and Liquid Waste Management 1 0.01 0.01
95%
Total 162 5.00 3.49
All 21 rows (zero-value rows hidden) ⇩ Export to Excel