Scope
Works completed
414
Sanctioned (pure scheme)
₹2.89 Cr
Expenditure since inception
₹2.20 Cr

Top new work types

Top 10 · ranked by sanction cost (Admin Config)
01
Construction of Road and Culvert
20 works
₹54.39 L sanctioned
₹31.30 L spent (58%)
02
Plantation
13 works
₹38.49 L sanctioned
₹17.95 L spent (47%)
03
Construction of Check Dam/Stop Dam
11 works
₹32.00 L sanctioned
₹25.31 L spent (79%)
04
Works for Flood Control and Protection
4 works
₹30.77 L sanctioned
₹29.01 L spent (94%)
05
Constr of Cement Concrete Roads
16 works
₹19.89 L sanctioned
₹13.28 L spent (67%)
06
Construction of Crematorium
1 works
₹17.60 L sanctioned
₹11.36 L spent (65%)
07
Construction of NADEP/Vermi Compost Pit
100 works
₹17.05 L sanctioned
₹15.81 L spent (93%)
08
Land Development
19 works
₹14.79 L sanctioned
₹9.07 L spent (61%)
09
Solid and Liquid Waste Management
7 works
₹13.65 L sanctioned
₹20.43 L spent (150%)
10
Cattle Shed
21 works
₹9.36 L sanctioned
₹9.11 L spent (97%)

Detailed breakdown (All amounts in ₹ Lakh)

By District / Block / Panchayat By New Work Type
Sr. New Work Type Completed Sanctioned Expenditure Exp. %
1 Construction of Toilets 166 9.00 8.49
94%
2 Construction of NADEP/Vermi Compost Pit 100 17.05 15.81
93%
3 Rural Housing 24 4.13 3.86
93%
4 Cattle Shed 21 9.36 9.11
97%
5 Construction of Road and Culvert 20 54.39 31.30
58%
6 Land Development 19 14.79 9.07
61%
7 Constr of Cement Concrete Roads 16 19.89 13.28
67%
8 Plantation 13 38.49 17.95
47%
9 Construction of Check Dam/Stop Dam 11 32.00 25.31
79%
10 Solid and Liquid Waste Management 7 13.65 20.43
150%
11 Works for Flood Control and Protection 4 30.77 29.01
94%
12 Construction of Tank 3 0.70 0.66
95%
13 Construction of Trench 2 7.84 6.38
81%
14 Well Recharge 2 0.29 0.28
96%
15 Constr of Food Grain storage 1 8.03 7.81
97%
16 Farm Pond 1 0.08 0.10
116%
17 Construction of Bund 1 3.69 3.50
95%
18 Construction of Water Drain/Diversion Channel/Drainage/Field Channel 1 4.79 4.13
86%
19 Repair & maint of Pond/ Tank 1 2.40 2.28
95%
20 Construction of Crematorium 1 17.60 11.36
65%
Total 414 288.95 220.11