Scope
Works completed
162
Sanctioned (pure scheme)
₹1.74 Cr
Expenditure since inception
₹1.15 Cr

Top new work types

Top 10 · ranked by sanction cost (Admin Config)
01
Construction of Road and Culvert
7 works
₹47.73 L sanctioned
₹15.15 L spent (32%)
02
Construction of Tank
3 works
₹29.17 L sanctioned
₹19.65 L spent (67%)
03
Constr of Cement Concrete Roads
34 works
₹16.35 L sanctioned
₹15.36 L spent (94%)
04
Construction of Bund
4 works
₹9.54 L sanctioned
₹8.50 L spent (89%)
05
Construction of Check Dam/Stop Dam
9 works
₹8.44 L sanctioned
₹7.09 L spent (84%)
06
Constr of Food Grain storage
1 works
₹8.03 L sanctioned
₹7.97 L spent (99%)
07
Rural Housing
32 works
₹6.01 L sanctioned
₹5.65 L spent (94%)
08
Repair & maint of Pond/ Tank
3 works
₹5.32 L sanctioned
₹3.95 L spent (74%)
09
Constr of Compound wall
1 works
₹5.11 L sanctioned
₹5.08 L spent (99%)
10
Farm Pond
8 works
₹4.95 L sanctioned
₹3.72 L spent (75%)

Detailed breakdown (All amounts in ₹ Lakh)

By District / Block / Panchayat By New Work Type
Sr. New Work Type Completed Sanctioned Expenditure Exp. %
1 Constr of Cement Concrete Roads 34 16.35 15.36
94%
2 Rural Housing 32 6.01 5.65
94%
3 Construction of Toilets 16 0.93 0.91
98%
4 Construction of NADEP/Vermi Compost Pit 15 2.20 1.67
76%
5 Construction of Check Dam/Stop Dam 9 8.44 7.09
84%
6 Farm Pond 8 4.95 3.72
75%
7 Construction of Road and Culvert 7 47.73 15.15
32%
8 Land Development 5 2.50 1.26
50%
9 Construction of Trench 4 3.08 2.15
70%
10 Construction of Bund 4 9.54 8.50
89%
11 Construction of Tank 3 29.17 19.65
67%
12 Repair & maint of Pond/ Tank 3 5.32 3.95
74%
13 Cattle Shed 3 2.52 1.98
79%
14 Well Recharge 2 0.52 0.49
94%
15 Constr of Aganwadi 2 1.47 0.97
66%
16 Constr of GP Bhawan 2 1.82 1.78
98%
17 Construction of Water Drain/Diversion Channel/Drainage/Field Channel 2 2.92 1.67
57%
18 Construction of Well 2 0.67 0.41
61%
19 Culvert 2 4.40 3.94
90%
20 Construction of Crematorium 1 1.80 1.88
105%
21 Boulder Check/Gully Plug 1 2.98 2.16
73%
22 Constr of Food Grain storage 1 8.03 7.97
99%
23 Plantation 1 3.35 0.29
9%
24 Constr of Compound wall 1 5.11 5.08
100%
25 Community Sanitary Complex 1 0.45 0.34
75%
26 Construction of Play field 1 1.87 0.69
37%
Total 162 174.12 114.72