Works completed
191
Sanctioned (pure scheme)
₹3.26 Cr
Expenditure since inception
₹1.83 Cr

Top new work types

Top 10 · ranked by sanction cost (Admin Config)
01
Construction of Road and Culvert
5 works
₹86.72 L sanctioned
₹17.79 L spent (21%)
02
Construction of Bund
42 works
₹60.14 L sanctioned
₹44.06 L spent (73%)
03
Construction of Check Dam/Stop Dam
12 works
₹40.89 L sanctioned
₹31.36 L spent (77%)
04
Construction of Trench
16 works
₹33.94 L sanctioned
₹28.37 L spent (84%)
05
Plantation
9 works
₹20.25 L sanctioned
₹9.42 L spent (47%)
06
Farm Pond
20 works
₹19.58 L sanctioned
₹11.84 L spent (60%)
07
Constr of Cement Concrete Roads
26 works
₹18.14 L sanctioned
₹10.62 L spent (59%)
08
Cattle Shed
9 works
₹7.56 L sanctioned
₹5.38 L spent (71%)
09
Construction of Play field
3 works
₹5.60 L sanctioned
₹13,796 spent (2%)
10
Construction of Crematorium
3 works
₹4.69 L sanctioned
₹4.27 L spent (91%)

Detailed breakdown (All amounts in ₹ Lakh)

By District / Block / Panchayat By New Work Type
Sr. New Work Type Completed Sanctioned Expenditure Exp. %
1 Construction of Bund 42 60.14 44.06
73%
2 Constr of Cement Concrete Roads 26 18.14 10.62
59%
3 Farm Pond 20 19.58 11.84
60%
4 Construction of Trench 16 33.94 28.37
84%
5 Rural Housing 16 3.22 3.02
94%
6 Construction of Check Dam/Stop Dam 12 40.89 31.36
77%
7 Cattle Shed 9 7.56 5.38
71%
8 Plantation 9 20.25 9.42
47%
9 Construction of Toilets 8 1.26 0.75
59%
10 Construction of NADEP/Vermi Compost Pit 8 2.26 1.48
65%
11 Construction of Road and Culvert 5 86.72 17.79
21%
12 Well Recharge 3 0.78 0.60
77%
13 Construction of Crematorium 3 4.69 4.27
91%
14 Construction of Play field 3 5.60 0.14
3%
15 Land Development 3 1.24 0.39
31%
16 Construction of Tank 1 3.11 1.91
61%
17 Other Works 1 3.85 2.08
54%
18 Constr of GP Bhawan 1 1.80 1.75
97%
19 Repair & Maint of Check Dam/Stop Dam 1 1.35 1.17
87%
20 Repair & maint of Water Harvesting Structures 1 3.10 2.62
85%
21 Terracing 1 0.35 0.32
92%
22 Construction of Water Drain/Diversion Channel/Drainage/Field Channel 1 3.07 3.04
99%
23 Construction of Well 1 3.32 0.79
24%
Total 191 326.22 183.16