Showcase — Completed Works

Rollup last refreshed: 2026-07-11 02:05:34.314168
to
to
Reset filters
Scope
Works completed
233
Sanctioned (pure scheme)
₹2.10 Cr
Expenditure since inception
₹1.58 Cr

Top new work types

Top 10 · ranked by sanction cost (Admin Config)
01
Farm Pond
100 works
₹81.04 L sanctioned
₹62.07 L spent (77%)
02
Construction of Road and Culvert
8 works
₹28.39 L sanctioned
₹26.89 L spent (95%)
03
Construction of Trench
3 works
₹15.02 L sanctioned
₹7.32 L spent (49%)
04
Construction of Water Drain/Diversion Channel/Drainage/Field Channel
5 works
₹14.39 L sanctioned
₹9.28 L spent (64%)
05
Constr of Cement Concrete Roads
41 works
₹13.64 L sanctioned
₹13.61 L spent (100%)
06
Construction of Check Dam/Stop Dam
6 works
₹12.02 L sanctioned
₹8.48 L spent (71%)
07
Plantation
2 works
₹6.70 L sanctioned
₹54,124 spent (8%)
08
Construction of Well
3 works
₹6.00 L sanctioned
₹3.89 L spent (65%)
09
Rural Housing
32 works
₹5.71 L sanctioned
₹5.40 L spent (95%)
10
Construction of Canal
3 works
₹5.70 L sanctioned
₹4.46 L spent (78%)

Detailed breakdown (All amounts in ₹ Lakh)

By District / Block / Panchayat By New Work Type
Sr. New Work Type Completed Sanctioned Expenditure Exp. %
1 Farm Pond 100 81.04 62.07
77%
2 Constr of Cement Concrete Roads 41 13.64 13.61
100%
3 Rural Housing 32 5.71 5.40
95%
4 Construction of Road and Culvert 8 28.39 26.89
95%
5 Construction of Toilets 7 0.84 0.57
68%
6 Construction of Check Dam/Stop Dam 6 12.02 8.48
71%
7 Construction of Water Drain/Diversion Channel/Drainage/Field Channel 5 14.39 9.28
65%
8 Construction of Trench 3 15.02 7.32
49%
9 Repair & maint of Pond/ Tank 3 1.57 1.39
88%
10 Cattle Shed 3 2.52 2.41
96%
11 Construction of Bund 3 0.00 0.02
0%
12 Construction of Canal 3 5.70 4.46
78%
13 Construction of Well 3 6.00 3.89
65%
14 Boulder Check/Gully Plug 2 5.38 3.04
56%
15 Constr of GP Bhawan 2 0.95 0.92
97%
16 Other Works 2 0.68 0.64
94%
17 Plantation 2 6.70 0.54
8%
18 Renovation of traditional water bodies 2 0.93 0.93
100%
19 Well Recharge 2 0.52 0.48
93%
20 Construction of Tank 1 2.88 1.12
39%
21 Land Development 1 2.20 2.07
94%
22 Construction of Play field 1 1.87 1.67
89%
23 Repair & maint of Water Harvesting Structures 1 0.58 0.59
102%
Total 233 209.54 157.77
All 23 rows (zero-value rows hidden) ⇩ Export to Excel