MGNREGA Works Dashboard
Admin login

Showcase — Completed Works

Rollup last refreshed: 2026-07-11 02:05:34.314168
to
to
Reset filters
Scope
Works completed
368
Sanctioned (pure scheme)
₹5.75 Cr
Expenditure since inception
₹4.97 Cr

Top new work types

Top 10 · ranked by sanction cost (Admin Config)
01
Construction of Road and Culvert
12 works
₹1.27 Cr sanctioned
₹1.20 Cr spent (94%)
02
Construction of Well
41 works
₹1.02 Cr sanctioned
₹93.92 L spent (92%)
03
Construction of Trench
9 works
₹52.66 L sanctioned
₹40.80 L spent (77%)
04
Construction of Check Dam/Stop Dam
23 works
₹38.71 L sanctioned
₹33.65 L spent (87%)
05
Rural Housing
172 works
₹35.70 L sanctioned
₹35.26 L spent (99%)
06
Constr of Cement Concrete Roads
9 works
₹30.13 L sanctioned
₹13.49 L spent (45%)
07
Construction of Tank
4 works
₹27.66 L sanctioned
₹24.95 L spent (90%)
08
Plantation
10 works
₹24.58 L sanctioned
₹12.31 L spent (50%)
09
Construction of Bund
7 works
₹24.21 L sanctioned
₹23.74 L spent (98%)
10
Constr of Gabion
22 works
₹22.93 L sanctioned
₹21.24 L spent (93%)

Detailed breakdown (All amounts in ₹ Crore)

By District / Block / Panchayat By New Work Type
Sr. New Work Type Completed Sanctioned Expenditure Exp. %
1 Rural Housing 172 0.36 0.35
99%
2 Construction of Well 41 1.02 0.94
92%
3 Construction of Check Dam/Stop Dam 23 0.39 0.34
87%
4 Construction of Recharge Pits 22 0.16 0.15
89%
5 Constr of Gabion 22 0.23 0.21
93%
6 Construction of Road and Culvert 12 1.27 1.20
94%
7 Plantation 10 0.25 0.12
50%
8 Constr of Cement Concrete Roads 9 0.30 0.13
45%
9 Construction of Trench 9 0.53 0.41
78%
10 Farm Pond 8 0.04 0.04
92%
11 Construction of Bund 7 0.24 0.24
98%
12 Construction of NADEP/Vermi Compost Pit 6 0.02 0.02
93%
13 Land Development 5 0.22 0.17
78%
14 Construction of Tank 4 0.28 0.25
90%
15 Construction of Percolation Tank 3 0.12 0.11
96%
16 Repair & maint of Water Harvesting Structures 3 0.03 0.02
83%
17 Well Recharge 2 0.09 0.07
84%
18 Culvert 2 0.02 0.02
100%
19 Repair & maint of Pond/ Tank 2 0.07 0.07
99%
20 Construction of Play field 1 0.04 0.02
53%
21 Construction of Crematorium 1 0.02 0.02
99%
22 Cattle Shed 1 0.01 0.01
96%
23 Constr of Compound wall 1 0.00 0.00
98%
24 Renovation of traditional water bodies 1 0.05 0.05
100%
25 Construction of Water Drain/Diversion Channel/Drainage/Field Channel 1 0.01 0.00
78%
Total 368 5.75 4.97