Scope
Works completed
353
Sanctioned (pure scheme)
₹4.46 Cr
Expenditure since inception
₹3.42 Cr

Top new work types

Top 10 · ranked by sanction cost (Admin Config)
01
Construction of Check Dam/Stop Dam
10 works
₹63.47 L sanctioned
₹61.11 L spent (96%)
02
Farm Pond
19 works
₹53.89 L sanctioned
₹47.14 L spent (87%)
03
Construction of Road and Culvert
6 works
₹42.39 L sanctioned
₹14.32 L spent (34%)
04
Deepening / Desilting of Flood Channels
9 works
₹39.43 L sanctioned
₹32.29 L spent (82%)
05
Constr of Cement Concrete Roads
27 works
₹36.73 L sanctioned
₹27.81 L spent (76%)
06
Construction of Bund
37 works
₹35.53 L sanctioned
₹28.81 L spent (81%)
07
Well Recharge
14 works
₹33.13 L sanctioned
₹28.51 L spent (86%)
08
Renovation of traditional water bodies
18 works
₹29.19 L sanctioned
₹20.18 L spent (69%)
09
Construction of Well
6 works
₹20.62 L sanctioned
₹11.30 L spent (55%)
10
Rural Housing
98 works
₹18.28 L sanctioned
₹17.01 L spent (93%)

Detailed breakdown (All amounts in ₹ Lakh)

By District / Block / Panchayat By New Work Type
Sr. New Work Type Completed Sanctioned Expenditure Exp. %
1 Rural Housing 98 18.28 17.01
93%
2 Construction of Toilets 43 2.32 0.45
19%
3 Construction of Bund 37 35.53 28.81
81%
4 Construction of NADEP/Vermi Compost Pit 30 3.83 3.80
99%
5 Constr of Cement Concrete Roads 27 36.73 27.81
76%
6 Farm Pond 19 53.89 47.14
88%
7 Renovation of traditional water bodies 18 29.19 20.18
69%
8 Well Recharge 14 33.13 28.51
86%
9 Construction of Check Dam/Stop Dam 10 63.47 61.11
96%
10 Deepening / Desilting of Flood Channels 9 39.43 32.29
82%
11 Construction of Well 6 20.62 11.30
55%
12 Construction of Road and Culvert 6 42.39 14.32
34%
13 Repair & maint of Water Harvesting Structures 5 0.27 0.13
47%
14 Constr of GP Bhawan 5 9.77 9.03
92%
15 Land Development 5 3.25 2.13
66%
16 Construction of Water Drain/Diversion Channel/Drainage/Field Channel 3 1.66 1.57
94%
17 Constr of Gabion 3 5.50 5.23
95%
18 Construction of Tank 3 10.93 9.23
84%
19 Culvert 2 6.53 1.53
24%
20 Plantation 2 3.48 0.57
16%
21 Construction of Recharge Pits 1 3.77 3.65
97%
22 Boulder Check/Gully Plug 1 1.26 0.89
70%
23 Construction of Trench 1 3.25 2.54
78%
24 Construction of Percolation Tank 1 3.67 3.01
82%
25 Repair & Maint of Bund 1 10.35 6.33
61%
26 Repair & maint of Pond/ Tank 1 3.10 2.94
95%
27 Solid and Liquid Waste Management 1 0.56 0.54
96%
28 Underground Dyke for Ground Water Recharge 1 0.13 0.13
100%
Total 353 446.29 342.16