MGNREGA Works Dashboard
Admin login

Showcase — Completed Works

Rollup last refreshed: 2026-07-11 02:05:34.314168
to
to
Reset filters
Scope
Works completed
259
Sanctioned (pure scheme)
₹3.41 Cr
Expenditure since inception
₹2.46 Cr

Top new work types

Top 10 · ranked by sanction cost (Admin Config)
01
Construction of Road and Culvert
8 works
₹59.61 L sanctioned
₹36.22 L spent (61%)
02
Construction of Well
17 works
₹50.09 L sanctioned
₹43.71 L spent (87%)
03
Construction of Check Dam/Stop Dam
6 works
₹31.13 L sanctioned
₹13.80 L spent (44%)
04
Renovation of traditional water bodies
14 works
₹30.50 L sanctioned
₹29.38 L spent (96%)
05
Farm Pond
12 works
₹28.90 L sanctioned
₹20.16 L spent (70%)
06
Rural Housing
118 works
₹23.07 L sanctioned
₹21.77 L spent (94%)
07
Constr of Cement Concrete Roads
21 works
₹22.39 L sanctioned
₹18.52 L spent (83%)
08
Well Recharge
12 works
₹18.21 L sanctioned
₹16.49 L spent (91%)
09
Construction of Bund
10 works
₹17.43 L sanctioned
₹13.85 L spent (79%)
10
Works for Flood Control and Protection
1 works
₹14.11 L sanctioned
₹75,978 spent (5%)

Detailed breakdown (All amounts in ₹ Lakh)

By District / Block / Panchayat By New Work Type
Sr. New Work Type Completed Sanctioned Expenditure Exp. %
1 Rural Housing 118 23.07 21.77
94%
2 Constr of Cement Concrete Roads 21 22.39 18.52
83%
3 Construction of Well 17 50.09 43.71
87%
4 Renovation of traditional water bodies 14 30.50 29.38
96%
5 Construction of Toilets 13 0.70 0.67
96%
6 Farm Pond 12 28.90 20.16
70%
7 Well Recharge 12 18.21 16.49
91%
8 Construction of Bund 10 17.43 13.85
79%
9 Construction of Road and Culvert 8 59.61 36.22
61%
10 Land Development 8 3.73 2.46
66%
11 Construction of Check Dam/Stop Dam 6 31.13 13.80
44%
12 Construction of Trench 5 5.32 4.35
82%
13 Construction of Recharge Pits 3 3.85 2.94
76%
14 Construction of Percolation Tank 2 7.56 5.34
71%
15 Plantation 2 6.70 0.41
6%
16 Constr of Gabion 2 4.49 4.14
92%
17 Works for Flood Control and Protection 1 14.11 0.76
5%
18 Constr of GP Bhawan 1 0.08 0.08
101%
19 Construction of Canal 1 3.33 2.41
72%
20 Construction of Crematorium 1 2.45 1.76
72%
21 Deepening / Desilting of Flood Channels 1 4.42 3.87
88%
22 Terracing 1 2.68 2.64
98%
Total 259 340.75 245.72
All 22 rows (zero-value rows hidden) ⇩ Export to Excel