Showcase — Completed Works

Rollup last refreshed: 2026-07-11 02:05:34.314168
to
to
Reset filters
Scope
Works completed
273
Sanctioned (pure scheme)
₹3.14 Cr
Expenditure since inception
₹2.40 Cr

Top new work types

Top 10 · ranked by sanction cost (Admin Config)
01
Construction of Road and Culvert
8 works
₹63.98 L sanctioned
₹39.48 L spent (62%)
02
Plantation
22 works
₹33.26 L sanctioned
₹14.54 L spent (44%)
03
Construction of Percolation Tank
5 works
₹28.83 L sanctioned
₹20.46 L spent (71%)
04
Construction of Check Dam/Stop Dam
24 works
₹28.61 L sanctioned
₹33.23 L spent (116%)
05
Rural Housing
146 works
₹25.72 L sanctioned
₹24.08 L spent (94%)
06
Construction of Well
12 works
₹20.89 L sanctioned
₹16.28 L spent (78%)
07
Solid and Liquid Waste Management
3 works
₹18.69 L sanctioned
₹17.71 L spent (95%)
08
Constr of Cement Concrete Roads
10 works
₹15.33 L sanctioned
₹14.96 L spent (98%)
09
Construction of Bund
10 works
₹14.46 L sanctioned
₹13.46 L spent (93%)
10
Constr of GP Bhawan
1 works
₹12.85 L sanctioned
₹9.95 L spent (77%)

Detailed breakdown (All amounts in ₹ Lakh)

By District / Block / Panchayat By New Work Type
Sr. New Work Type Completed Sanctioned Expenditure Exp. %
1 Rural Housing 146 25.72 24.08
94%
2 Construction of Check Dam/Stop Dam 24 28.61 33.23
116%
3 Plantation 22 33.26 14.54
44%
4 Construction of Well 12 20.89 16.28
78%
5 Constr of Cement Concrete Roads 10 15.33 14.96
98%
6 Construction of Bund 10 14.46 13.46
93%
7 Boulder Check/Gully Plug 9 12.06 11.32
94%
8 Construction of Road and Culvert 8 63.98 39.48
62%
9 Well Recharge 7 1.12 1.11
100%
10 Construction of Percolation Tank 5 28.83 20.46
71%
11 Solid and Liquid Waste Management 3 18.69 17.71
95%
12 Farm Pond 3 8.37 6.28
75%
13 Culvert 2 9.72 2.46
25%
14 Construction of Toilets 2 0.24 0.24
100%
15 Cattle Shed 2 1.56 1.50
96%
16 Construction of Crematorium 2 4.25 4.20
99%
17 Constr of GP Bhawan 1 12.85 9.95
77%
18 Community Sanitary Complex 1 0.44 0.34
78%
19 Deepening / Desilting of Flood Channels 1 3.82 1.61
42%
20 Construction of NADEP/Vermi Compost Pit 1 1.39 1.33
96%
21 Construction of Water Drain/Diversion Channel/Drainage/Field Channel 1 3.33 2.71
81%
22 Repair & maint of Pond/ Tank 1 4.98 2.40
48%
Total 273 313.90 239.66