Rollup last refreshed: 2026-07-11 02:05:34.314168
to
to
Reset filters
Scope
Works completed
213
Sanctioned (pure scheme)
₹3.16 Cr
Expenditure since inception
₹3.09 Cr

Top new work types

Top 10 · ranked by sanction cost (Admin Config)
01
Construction of Road and Culvert
11 works
₹67.64 L sanctioned
₹75.43 L spent (112%)
02
Repair & maint of Pond/ Tank
5 works
₹46.33 L sanctioned
₹44.41 L spent (96%)
03
Construction of Check Dam/Stop Dam
4 works
₹41.74 L sanctioned
₹34.10 L spent (82%)
04
Construction of Well
15 works
₹39.07 L sanctioned
₹36.37 L spent (93%)
05
Rural Housing
125 works
₹21.21 L sanctioned
₹20.84 L spent (98%)
06
Constr of Cement Concrete Roads
12 works
₹19.02 L sanctioned
₹16.63 L spent (87%)
07
Construction of Water Drain/Diversion Channel/Drainage/Field Channel
1 works
₹14.77 L sanctioned
₹13.71 L spent (93%)
08
Construction of Tank
1 works
₹14.22 L sanctioned
₹11.72 L spent (82%)
09
Renovation of traditional water bodies
1 works
₹9.99 L sanctioned
₹9.98 L spent (100%)
10
Construction of Percolation Tank
3 works
₹9.89 L sanctioned
₹9.59 L spent (97%)

Detailed breakdown (All amounts in ₹ Lakh)

By District / Block / Panchayat By New Work Type
Sr. New Work Type Completed Sanctioned Expenditure Exp. %
1 Rural Housing 125 21.21 20.84
98%
2 Construction of Well 15 39.07 36.37
93%
3 Constr of Cement Concrete Roads 12 19.02 16.63
87%
4 Construction of Road and Culvert 11 67.64 75.43
112%
5 Land Development 9 6.23 5.74
92%
6 Construction of Bund 9 1.97 10.32
525%
7 Repair & maint of Pond/ Tank 5 46.33 44.41
96%
8 Plantation 4 7.93 0.51
7%
9 Construction of Check Dam/Stop Dam 4 41.74 34.10
82%
10 Works for Flood Control and Protection 3 2.37 1.31
55%
11 Construction of Percolation Tank 3 9.89 9.59
97%
12 Farm Pond 3 2.35 2.26
96%
13 Construction of Tank 1 14.22 11.72
82%
14 Construction of Water Drain/Diversion Channel/Drainage/Field Channel 1 14.77 13.71
93%
15 Construction of Crematorium 1 1.80 1.60
89%
16 Strengthening of Embankment 1 0.00 4.75
0%
17 Well Recharge 1 2.30 0.05
2%
18 Construction of Toilets 1 1.20 1.19
99%
19 Culvert 1 0.00 3.33
0%
20 Construction of Play field 1 1.86 1.84
99%
21 Construction of NADEP/Vermi Compost Pit 1 3.78 3.77
100%
22 Renovation of traditional water bodies 1 9.99 9.98
100%
Total 213 315.67 309.44