MGNREGA Works Dashboard
Admin login

Showcase — Completed Works

Rollup last refreshed: 2026-07-11 02:05:34.314168
to
to
Reset filters
Scope
Works completed
318
Sanctioned (pure scheme)
₹6.82 Cr
Expenditure since inception
₹6.09 Cr

Top new work types

Top 10 · ranked by sanction cost (Admin Config)
01
Construction of Road and Culvert
24 works
₹1.72 Cr sanctioned
₹1.71 Cr spent (99%)
02
Construction of Well
36 works
₹84.74 L sanctioned
₹90.41 L spent (107%)
03
Construction of Bund
14 works
₹84.67 L sanctioned
₹79.21 L spent (94%)
04
Construction of Check Dam/Stop Dam
9 works
₹50.26 L sanctioned
₹46.04 L spent (92%)
05
Land Development
54 works
₹46.16 L sanctioned
₹29.82 L spent (65%)
06
Repair & maint of Pond/ Tank
4 works
₹38.47 L sanctioned
₹37.37 L spent (97%)
07
Construction of Water Drain/Diversion Channel/Drainage/Field Channel
2 works
₹29.84 L sanctioned
₹29.02 L spent (97%)
08
Plantation
11 works
₹29.82 L sanctioned
₹3.92 L spent (13%)
09
Construction of Percolation Tank
5 works
₹29.07 L sanctioned
₹19.03 L spent (65%)
10
Rural Housing
115 works
₹20.76 L sanctioned
₹20.18 L spent (97%)

Detailed breakdown (All amounts in ₹ Crore)

By District / Block / Panchayat By New Work Type
Sr. New Work Type Completed Sanctioned Expenditure Exp. %
1 Rural Housing 115 0.21 0.20
97%
2 Land Development 54 0.46 0.30
65%
3 Construction of Well 36 0.85 0.90
107%
4 Construction of Road and Culvert 24 1.72 1.71
99%
5 Construction of Bund 14 0.85 0.79
94%
6 Construction of Toilets 14 0.02 0.02
100%
7 Plantation 11 0.30 0.04
13%
8 Constr of Cement Concrete Roads 10 0.16 0.15
94%
9 Construction of Check Dam/Stop Dam 9 0.50 0.46
92%
10 Construction of Percolation Tank 5 0.29 0.19
66%
11 Goat Shelter 5 0.04 0.04
92%
12 Repair & maint of Pond/ Tank 4 0.38 0.37
97%
13 Construction of Play field 4 0.16 0.15
97%
14 Renovation of traditional water bodies 2 0.07 0.01
15%
15 Boulder Check/Gully Plug 2 0.00 0.01
0%
16 Farm Pond 2 0.03 0.03
94%
17 Construction of Water Drain/Diversion Channel/Drainage/Field Channel 2 0.30 0.29
97%
18 Works for Flood Control and Protection 1 0.15 0.15
98%
19 Constr of Gabion 1 0.05 0.03
54%
20 Construction of Tank 1 0.20 0.20
99%
21 Other Works 1 0.03 0.01
21%
22 Repair & Maint of Check Dam/Stop Dam 1 0.05 0.05
93%
Total 318 6.82 6.09
All 22 rows (zero-value rows hidden) ⇩ Export to Excel