Works completed
560
Sanctioned (pure scheme)
₹5.50 Cr
Expenditure since inception
₹4.87 Cr

Top new work types

Top 10 · ranked by sanction cost (Admin Config)
01
Construction of Road and Culvert
14 works
₹1.05 Cr sanctioned
₹76.22 L spent (73%)
02
Construction of Bund
45 works
₹1.02 Cr sanctioned
₹90.94 L spent (89%)
03
Construction of Well
38 works
₹89.20 L sanctioned
₹87.81 L spent (98%)
04
Rural Housing
345 works
₹56.83 L sanctioned
₹56.85 L spent (100%)
05
Construction of Check Dam/Stop Dam
10 works
₹36.57 L sanctioned
₹40.13 L spent (110%)
06
Repair & maint of Pond/ Tank
3 works
₹17.06 L sanctioned
₹16.77 L spent (98%)
07
Plantation
9 works
₹16.67 L sanctioned
₹8.22 L spent (49%)
08
Construction of Tank
1 works
₹15.00 L sanctioned
₹14.82 L spent (99%)
09
Repair & maint of Gully Plugs
1 works
₹14.92 L sanctioned
₹14.68 L spent (98%)
10
Constr of Cement Concrete Roads
11 works
₹13.17 L sanctioned
₹11.35 L spent (86%)

Detailed breakdown (All amounts in ₹ Crore)

By District / Block / Panchayat By New Work Type
Sr. New Work Type Completed Sanctioned Expenditure Exp. %
1 Rural Housing 345 0.57 0.57
100%
2 Construction of Bund 45 1.02 0.91
89%
3 Construction of Well 38 0.89 0.88
98%
4 Land Development 24 0.13 0.12
96%
5 Boulder Check/Gully Plug 18 0.12 0.11
95%
6 Construction of Road and Culvert 14 1.05 0.76
73%
7 Farm Pond 13 0.10 0.07
73%
8 Construction of Toilets 13 0.02 0.02
100%
9 Constr of Cement Concrete Roads 11 0.13 0.11
86%
10 Construction of Check Dam/Stop Dam 10 0.37 0.40
110%
11 Plantation 9 0.17 0.08
49%
12 Repair & maint of Pond/ Tank 3 0.17 0.17
98%
13 Repair & Maint of Community infrastructure 2 0.11 0.11
99%
14 Construction of Play field 2 0.07 0.03
50%
15 Well Recharge 1 0.06 0.05
90%
16 Constr of Compound wall 1 0.01 0.01
102%
17 Constr of Kitchen Shed 1 0.00 0.00
6%
18 Construction of Crematorium 1 0.02 0.02
103%
19 Construction of Embankment 1 0.00 0.00
38%
20 Construction of Recharge Pits 1 0.00 0.00
3%
21 Construction of Tank 1 0.15 0.15
99%
22 Construction of Trench 1 0.01 0.01
68%
23 Other Works 1 0.04 0.00
2%
24 Repair & Maint of Bund 1 0.08 0.06
79%
25 Repair & maint of Gully Plugs 1 0.15 0.15
98%
26 Repair & maint of Water Harvesting Structures 1 0.07 0.06
91%
27 Solid and Liquid Waste Management 1 0.00 0.00
100%
Total 560 5.50 4.87