Works completed
204
Sanctioned (pure scheme)
₹2.49 Cr
Expenditure since inception
₹1.84 Cr

Top new work types

Top 10 · ranked by sanction cost (Admin Config)
01
Construction of Road and Culvert
6 works
₹42.09 L sanctioned
₹24.83 L spent (59%)
02
Construction of Check Dam/Stop Dam
4 works
₹33.20 L sanctioned
₹26.44 L spent (80%)
03
Plantation
13 works
₹33.07 L sanctioned
₹17.79 L spent (54%)
04
Construction of Tank
5 works
₹22.10 L sanctioned
₹14.18 L spent (64%)
05
Construction of Trench
2 works
₹20.11 L sanctioned
₹15.59 L spent (78%)
06
Rural Housing
78 works
₹14.78 L sanctioned
₹14.66 L spent (99%)
07
Works for Flood Control and Protection
1 works
₹14.60 L sanctioned
₹13.77 L spent (94%)
08
Repair & maint of Pond/ Tank
7 works
₹10.09 L sanctioned
₹9.65 L spent (96%)
09
Land Development
2 works
₹8.56 L sanctioned
₹4.14 L spent (48%)
10
Boulder Check/Gully Plug
15 works
₹7.72 L sanctioned
₹6.26 L spent (81%)

Detailed breakdown (All amounts in ₹ Lakh)

By District / Block / Panchayat By New Work Type
Sr. New Work Type Completed Sanctioned Expenditure Exp. %
1 Rural Housing 78 14.78 14.66
99%
2 Construction of Toilets 38 4.21 4.13
98%
3 Boulder Check/Gully Plug 15 7.72 6.26
81%
4 Plantation 13 33.07 17.79
54%
5 Constr of Cement Concrete Roads 9 5.79 5.22
90%
6 Repair & maint of Pond/ Tank 7 10.09 9.65
96%
7 Construction of Road and Culvert 6 42.09 24.83
59%
8 Well Recharge 6 3.62 3.42
95%
9 Construction of Tank 5 22.10 14.18
64%
10 Construction of Check Dam/Stop Dam 4 33.20 26.44
80%
11 Roof Water Harvesting on gov/panchayat bldg 3 0.97 0.63
65%
12 Land Development 2 8.56 4.14
48%
13 Repair & maint of Water Harvesting Structures 2 0.73 0.50
68%
14 Construction of Well 2 4.45 4.31
97%
15 Construction of Water Drain/Diversion Channel/Drainage/Field Channel 2 6.53 4.25
65%
16 Construction of Trench 2 20.11 15.59
78%
17 Works for Flood Control and Protection 1 14.60 13.77
94%
18 Construction of Bund 1 1.10 0.83
76%
19 Construction of Crematorium 1 1.85 1.44
78%
20 Construction of Embankment 1 1.95 1.64
84%
21 Construction of Percolation Tank 1 3.62 2.96
82%
22 Community Sanitary Complex 1 0.44 0.43
98%
23 Culvert 1 0.49 0.49
99%
24 Farm Pond 1 3.33 2.83
85%
25 Repair & maint of Road 1 1.25 1.16
93%
26 Constr of Aganwadi 1 2.60 2.56
99%
Total 204 249.22 184.10