Scope
Works completed
730
Sanctioned (pure scheme)
₹8.09 Cr
Expenditure since inception
₹7.00 Cr

Top new work types

Top 10 · ranked by sanction cost (Admin Config)
01
Construction of Road and Culvert
17 works
₹1.76 Cr sanctioned
₹1.48 Cr spent (84%)
02
Construction of Well
80 works
₹1.19 Cr sanctioned
₹1.64 Cr spent (137%)
03
Construction of Check Dam/Stop Dam
14 works
₹1.09 Cr sanctioned
₹1.12 Cr spent (103%)
04
Plantation
29 works
₹69.72 L sanctioned
₹16.75 L spent (24%)
05
Construction of Water Drain/Diversion Channel/Drainage/Field Channel
20 works
₹65.00 L sanctioned
₹46.96 L spent (72%)
06
Farm Pond
24 works
₹62.61 L sanctioned
₹46.39 L spent (74%)
07
Rural Housing
311 works
₹57.58 L sanctioned
₹55.33 L spent (96%)
08
Construction of Percolation Tank
3 works
₹38.79 L sanctioned
₹34.92 L spent (90%)
09
Land Development
15 works
₹15.07 L sanctioned
₹9.45 L spent (63%)
10
Underground Dyke for Ground Water Recharge
4 works
₹13.41 L sanctioned
₹12.10 L spent (90%)

Detailed breakdown (All amounts in ₹ Crore)

By District / Block / Panchayat By New Work Type
Sr. New Work Type Completed Sanctioned Expenditure Exp. %
1 Rural Housing 311 0.58 0.55
96%
2 Construction of Toilets 144 0.08 0.07
82%
3 Construction of Well 80 1.19 1.64
137%
4 Plantation 29 0.70 0.17
24%
5 Farm Pond 24 0.63 0.46
74%
6 Construction of Water Drain/Diversion Channel/Drainage/Field Channel 20 0.65 0.47
72%
7 Construction of Road and Culvert 17 1.76 1.48
84%
8 Construction of Recharge Pits 17 0.05 0.03
53%
9 Land Development 15 0.15 0.09
63%
10 Construction of Check Dam/Stop Dam 14 1.09 1.12
103%
11 Construction of NADEP/Vermi Compost Pit 12 0.02 0.01
56%
12 Construction of Bund 11 0.08 0.07
80%
13 Constr of Cement Concrete Roads 9 0.09 0.08
93%
14 Underground Dyke for Ground Water Recharge 4 0.13 0.12
90%
15 Construction of Percolation Tank 3 0.39 0.35
90%
16 Renovation of traditional water bodies 3 0.03 0.04
113%
17 Constr of Gabion 2 0.01 0.01
119%
18 Construction of Crematorium 2 0.06 0.03
43%
19 Repair & maint of Water Harvesting Structures 2 0.10 0.07
73%
20 Constr of Aganwadi 2 0.10 0.02
16%
21 Culvert 2 0.01 0.01
90%
22 Repair & Maint of Community infrastructure 1 0.04 0.02
37%
23 Repair & maint of Road 1 0.00 0.00
99%
24 Solid and Liquid Waste Management 1 0.04 0.02
46%
25 Terracing 1 0.05 0.04
84%
26 Community Sanitary Complex 1 0.00 0.00
86%
27 Construction of Play field 1 0.00 0.01
0%
28 Construction of Trench 1 0.04 0.02
54%
Total 730 8.09 7.00