Showcase — Completed Works

Rollup last refreshed: 2026-07-11 02:05:34.314168
to
to
Reset filters
Scope
Works completed
428
Sanctioned (pure scheme)
₹7.37 Cr
Expenditure since inception
₹5.70 Cr

Top new work types

Top 10 · ranked by sanction cost (Admin Config)
01
Construction of Road and Culvert
14 works
₹2.52 Cr sanctioned
₹1.19 Cr spent (47%)
02
Construction of Well
78 works
₹1.85 Cr sanctioned
₹1.79 Cr spent (97%)
03
Construction of Check Dam/Stop Dam
12 works
₹99.72 L sanctioned
₹96.00 L spent (96%)
04
Construction of Trench
1 works
₹42.20 L sanctioned
₹49.60 L spent (118%)
05
Rural Housing
185 works
₹37.85 L sanctioned
₹35.52 L spent (94%)
06
Construction of Tank
2 works
₹29.98 L sanctioned
₹29.65 L spent (99%)
07
Construction of Percolation Tank
4 works
₹21.10 L sanctioned
₹14.09 L spent (67%)
08
Plantation
11 works
₹17.38 L sanctioned
₹8.08 L spent (47%)
09
Repair & maint of Pond/ Tank
4 works
₹12.03 L sanctioned
₹11.32 L spent (94%)
10
Constr of Cement Concrete Roads
19 works
₹10.34 L sanctioned
₹8.41 L spent (81%)

Detailed breakdown (All amounts in ₹ Crore)

By District / Block / Panchayat By New Work Type
Sr. New Work Type Completed Sanctioned Expenditure Exp. %
1 Rural Housing 185 0.38 0.36
94%
2 Construction of Well 78 1.85 1.79
97%
3 Construction of Toilets 53 0.02 0.02
101%
4 Constr of Cement Concrete Roads 19 0.10 0.08
81%
5 Construction of Road and Culvert 14 2.52 1.19
47%
6 Land Development 14 0.09 0.03
31%
7 Construction of Check Dam/Stop Dam 12 1.00 0.96
96%
8 Plantation 11 0.17 0.08
47%
9 Solid and Liquid Waste Management 10 0.01 0.00
21%
10 Well Recharge 7 0.02 0.02
97%
11 Construction of Water Drain/Diversion Channel/Drainage/Field Channel 4 0.01 0.00
9%
12 Repair & maint of Pond/ Tank 4 0.12 0.11
94%
13 Construction of Percolation Tank 4 0.21 0.14
67%
14 Renovation of traditional water bodies 2 0.01 0.02
173%
15 Construction of Tank 2 0.30 0.30
99%
16 Constr of Gabion 2 0.04 0.03
76%
17 Farm Pond 2 0.04 0.02
65%
18 Cattle Shed 1 0.01 0.00
6%
19 Constr of Compound wall 1 0.04 0.04
100%
20 Community Sanitary Complex 1 0.00 0.00
101%
21 Constr of GP Bhawan 1 0.02 0.01
60%
22 Construction of Trench 1 0.42 0.50
118%
Total 428 7.37 5.70