Showcase — Completed Works
Rollup last refreshed: 2026-07-11 02:05:34.314168
Top new work types
Top 10 · ranked by sanction cost (Admin Config)
01
Construction of Check Dam/Stop Dam
22 works
₹1.73 Cr sanctioned
₹1.52 Cr spent (88%)
02
Construction of Well
64 works
₹1.64 Cr sanctioned
₹1.63 Cr spent (99%)
03
Construction of Road and Culvert
10 works
₹1.00 Cr sanctioned
₹79.08 L spent (79%)
04
Construction of Tank
12 works
₹82.28 L sanctioned
₹66.45 L spent (81%)
05
Farm Pond
19 works
₹56.67 L sanctioned
₹42.11 L spent (74%)
06
Construction of Percolation Tank
5 works
₹45.66 L sanctioned
₹36.73 L spent (80%)
07
Construction of Trench
4 works
₹28.32 L sanctioned
₹20.77 L spent (73%)
08
Construction of Water Drain/Diversion Channel/Drainage/Field Channel
4 works
₹23.63 L sanctioned
₹22.78 L spent (96%)
09
Rural Housing
127 works
₹23.30 L sanctioned
₹22.87 L spent (98%)
10
Plantation
9 works
₹19.92 L sanctioned
₹9.10 L spent (46%)