Works completed
300
Sanctioned (pure scheme)
₹3.73 Cr
Expenditure since inception
₹2.63 Cr

Top new work types

Top 10 · ranked by sanction cost (Admin Config)
01
Plantation
36 works
₹96.58 L sanctioned
₹47.94 L spent (50%)
02
Construction of Road and Culvert
9 works
₹79.29 L sanctioned
₹60.59 L spent (76%)
03
Construction of Well
28 works
₹45.45 L sanctioned
₹35.19 L spent (77%)
04
Farm Pond
8 works
₹36.56 L sanctioned
₹17.48 L spent (48%)
05
Construction of Trench
14 works
₹31.38 L sanctioned
₹25.25 L spent (80%)
06
Rural Housing
97 works
₹17.72 L sanctioned
₹17.54 L spent (99%)
07
Constr of Cement Concrete Roads
18 works
₹14.78 L sanctioned
₹16.35 L spent (111%)
08
Construction of Percolation Tank
2 works
₹10.36 L sanctioned
₹8.49 L spent (82%)
09
Construction of Water Drain/Diversion Channel/Drainage/Field Channel
2 works
₹5.72 L sanctioned
₹3.84 L spent (67%)
10
Land Development
10 works
₹5.09 L sanctioned
₹5.12 L spent (101%)

Detailed breakdown (All amounts in ₹ Lakh)

By District / Block / Panchayat By New Work Type
Sr. New Work Type Completed Sanctioned Expenditure Exp. %
1 Rural Housing 97 17.72 17.54
99%
2 Construction of Toilets 45 1.96 1.38
70%
3 Plantation 36 96.58 47.94
50%
4 Construction of Well 28 45.45 35.19
77%
5 Constr of Cement Concrete Roads 18 14.78 16.35
111%
6 Construction of Trench 14 31.38 25.25
81%
7 Underground Dyke for Ground Water Recharge 10 3.54 2.92
83%
8 Land Development 10 5.09 5.12
101%
9 Construction of Road and Culvert 9 79.29 60.59
76%
10 Farm Pond 8 36.56 17.48
48%
11 Construction of NADEP/Vermi Compost Pit 4 0.90 0.59
66%
12 Construction of Check Dam/Stop Dam 3 3.83 4.30
112%
13 Construction of Bund 2 3.93 4.63
118%
14 Construction of Water Drain/Diversion Channel/Drainage/Field Channel 2 5.72 3.84
67%
15 Repair & maint of Pond/ Tank 2 1.75 1.54
88%
16 Construction of Percolation Tank 2 10.36 8.49
82%
17 Renovation of traditional water bodies 2 2.89 2.15
74%
18 Solid and Liquid Waste Management 2 1.14 1.01
89%
19 Cattle Shed 1 1.06 1.05
99%
20 Constr of Compound wall 1 0.46 0.44
95%
21 Constr of GP Bhawan 1 4.42 1.59
36%
22 Constr of Kitchen Shed 1 0.18 0.15
83%
23 Construction of Crematorium 1 1.80 1.55
86%
24 Terracing 1 2.25 1.92
85%
Total 300 373.04 263.00