Showcase — Completed Works

Rollup last refreshed: 2026-09-16 08:34:45.218851
to
to
Reset filters
Scope
Works completed
428
Sanctioned (pure scheme)
₹4.51 Cr
Expenditure since inception
₹3.34 Cr

Top new work types

Top 10 · ranked by sanction cost (Admin Config)
01
Construction of Road and Culvert
10 works
₹1.34 Cr sanctioned
₹88.83 L spent (66%)
02
Plantation
20 works
₹64.52 L sanctioned
₹29.06 L spent (45%)
03
Construction of Well
22 works
₹42.63 L sanctioned
₹33.90 L spent (80%)
04
Rural Housing
201 works
₹34.37 L sanctioned
₹34.02 L spent (99%)
05
Farm Pond
10 works
₹28.24 L sanctioned
₹21.82 L spent (77%)
06
Land Development
36 works
₹22.40 L sanctioned
₹17.01 L spent (76%)
07
Construction of Trench
4 works
₹16.05 L sanctioned
₹14.33 L spent (89%)
08
Terracing
3 works
₹15.93 L sanctioned
₹14.41 L spent (90%)
09
Constr of Cement Concrete Roads
11 works
₹15.71 L sanctioned
₹16.36 L spent (104%)
10
Construction of Tank
1 works
₹14.68 L sanctioned
₹13.40 L spent (91%)

Detailed breakdown (All amounts in ₹ Crore)

By District / Block / Panchayat By New Work Type
Sr. New Work Type Completed Sanctioned Expenditure Exp. %
1 Rural Housing 201 0.34 0.34
99%
2 Construction of Toilets 56 0.02 0.02
100%
3 Land Development 36 0.22 0.17
76%
4 Construction of Well 22 0.43 0.34
80%
5 Plantation 20 0.65 0.29
45%
6 Underground Dyke for Ground Water Recharge 18 0.05 0.04
81%
7 Well Recharge 13 0.03 0.03
93%
8 Constr of Cement Concrete Roads 11 0.16 0.16
104%
9 Farm Pond 10 0.28 0.22
77%
10 Construction of Road and Culvert 10 1.34 0.89
66%
11 Construction of Bund 6 0.02 0.00
13%
12 Construction of Trench 4 0.16 0.14
89%
13 Construction of Water Drain/Diversion Channel/Drainage/Field Channel 4 0.13 0.12
92%
14 Terracing 3 0.16 0.14
91%
15 Solid and Liquid Waste Management 3 0.01 0.01
101%
16 Construction of Check Dam/Stop Dam 2 0.07 0.08
105%
17 Constr of Kitchen Shed 2 0.00 0.00
75%
18 Works for Flood Control and Protection 1 0.14 0.13
97%
19 Construction of Crematorium 1 0.02 0.02
100%
20 Construction of Percolation Tank 1 0.03 0.03
84%
21 Construction of Play field 1 0.01 0.01
83%
22 Construction of Tank 1 0.15 0.13
91%
23 Culvert 1 0.00 0.00
122%
24 Renovation of traditional water bodies 1 0.06 0.00
0%
Total 428 4.51 3.34
All 24 rows (zero-value rows hidden) ⇩ Export to Excel