MGNREGA Works Dashboard
Admin login

Showcase — Completed Works

Rollup last refreshed: 2026-07-11 02:05:34.314168
to
to
Reset filters
Scope
Works completed
295
Sanctioned (pure scheme)
₹4.40 Cr
Expenditure since inception
₹3.62 Cr

Top new work types

Top 10 · ranked by sanction cost (Admin Config)
01
Construction of Road and Culvert
16 works
₹77.14 L sanctioned
₹64.47 L spent (84%)
02
Farm Pond
24 works
₹75.62 L sanctioned
₹63.08 L spent (83%)
03
Plantation
14 works
₹45.45 L sanctioned
₹33.23 L spent (73%)
04
Construction of Water Drain/Diversion Channel/Drainage/Field Channel
5 works
₹36.94 L sanctioned
₹33.50 L spent (91%)
05
Construction of Well
22 works
₹34.64 L sanctioned
₹31.57 L spent (91%)
06
Construction of Embankment
4 works
₹34.17 L sanctioned
₹31.15 L spent (91%)
07
Construction of Check Dam/Stop Dam
6 works
₹25.16 L sanctioned
₹18.85 L spent (75%)
08
Construction of Trench
9 works
₹20.81 L sanctioned
₹13.90 L spent (67%)
09
Rural Housing
103 works
₹20.67 L sanctioned
₹20.58 L spent (100%)
10
Constr of Cement Concrete Roads
19 works
₹16.61 L sanctioned
₹13.56 L spent (82%)

Detailed breakdown (All amounts in ₹ Lakh)

By District / Block / Panchayat By New Work Type
Sr. New Work Type Completed Sanctioned Expenditure Exp. %
1 Rural Housing 103 20.67 20.58
100%
2 Land Development 28 6.34 4.83
76%
3 Farm Pond 24 75.62 63.08
83%
4 Construction of Well 22 34.64 31.57
91%
5 Constr of Cement Concrete Roads 19 16.61 13.56
82%
6 Construction of Road and Culvert 16 77.14 64.47
84%
7 Plantation 14 45.45 33.23
73%
8 Construction of Toilets 10 1.20 1.19
99%
9 Well Recharge 9 2.33 2.12
91%
10 Construction of Trench 9 20.81 13.90
67%
11 Construction of Check Dam/Stop Dam 6 25.16 18.85
75%
12 Construction of Water Drain/Diversion Channel/Drainage/Field Channel 5 36.94 33.50
91%
13 Cattle Shed 4 4.48 3.21
72%
14 Construction of Embankment 4 34.17 31.15
91%
15 Construction of Percolation Tank 4 7.99 7.56
95%
16 Underground Dyke for Ground Water Recharge 3 1.14 1.09
96%
17 Solid and Liquid Waste Management 3 0.83 0.76
91%
18 Construction of Bund 3 1.11 0.88
79%
19 Renovation of traditional water bodies 3 6.33 0.03
1%
20 Construction of NADEP/Vermi Compost Pit 2 0.52 0.50
96%
21 Culvert 1 4.80 0.01
0%
22 Construction of Tank 1 0.91 0.91
100%
23 Works for Flood Control and Protection 1 13.39 13.11
98%
24 Constr of Aganwadi 1 1.80 1.80
100%
Total 295 440.38 361.89
All 24 rows (zero-value rows hidden) ⇩ Export to Excel